Type your search query and hit enter:
Homepage
NCCCO (National Commission for the Certification of Crane Operators)
Free NCCCO Tower Crane Operator Test 1
0%
What is the load hoisting sheaves minimum pitch diameter?
at least 16 times the diameter of the rope
at least 20 times the diameter of the rope
at least 18 times the diameter of the rope
at least 15 times the diameter of the rope
Correct!
Wrong!
Continue >>
Before an operator exits the crane, he has to:
From the center of the boom tip sheave to the boom hinge pins
ANSI B30.5-3.1.2: Position all dogs or pawls inside the load when it is on the ground.
Put an end to crane operations and notify the supervisor of the situation.
From the top of the reel to the top of the drum, the rope extends.
Correct!
Wrong!
Continue >>
How many line segments are needed to lift a 36,500 lb object? load if 9,000 pounds is the highest permitted line pull?
1926.14
3.5
5
45 ft.
Correct!
Wrong!
Continue >>
An auxiliary boom point sheave, sometimes known as a rooster sheave, is used primarily to:
Divide the hoist lines.
Reduce the load’s radius.
The front
Expand the boom’s height.
Correct!
Wrong!
Continue >>
When the crane’s boom length is in between the lengths indicated in the load chart, which capacity should you use?
At least as far back as the wall’s subsurface depth
From the top of the reel to the top of the drum, the rope extends.
Depending on which next boom length is shorter or longer and has a lower capacity
They depend on the crane’s steadiness.
Correct!
Wrong!
Continue >>
Boom length and angle can be utilized in a range diagram to ascertain
tilting axis
permitted load
ground force
load radius
Correct!
Wrong!
Continue >>
What minimal space between any portion of the crane or load and 850kV energized overhead power wires must be maintained, per OSHA 1926.1408?
25 ft.
30 ft.
45 ft.
35 ft.
Correct!
Wrong!
Continue >>
When a crane operator gives two audible signals while operating the machine, what does it mean?
Never
He or she plans to proceed.
He/she plans to provide support
From daily to monthly
Correct!
Wrong!
Continue >>
When a crane’s boom is lowered, what happens to the load’s leverage?
increases the stability of the crane
It rises
It remains unchanged.
It declines
Correct!
Wrong!
Continue >>
When the load moment indicator (LMI) on a crane malfunctions, what should an operator do?
Put an end to crane operations and notify the supervisor of the situation.
Make the blast as brief as you can
At least as far back as the wall’s subsurface depth
They depend on the crane’s steadiness.
Correct!
Wrong!
Continue >>
What does the term “operating radius” mean?
at least 15 times the diameter of the rope
The separation between the load’s center of gravity and the crane’s center of rotation
The load chart’s specified capacity less the sum of the weights of the rigging and all attachments
at least 18 times the diameter of the rope
Correct!
Wrong!
Continue >>
Subscribe to updates
Unsubscribe from updates
Related Post
Free NCCCO Service Truck Crane Operator Test 3
Free NCCCO Service Truck Crane Operator Test 2
Free NCCCO Tower Crane Operator Test 3