For spans, couple roof is used.
less than 8 m, but 6.5 m
6 to 6.5 m but not less than
less than 3.5 m
less than 5 m, but 2.5 m
Correct!
Wrong!
Continue >>
A cross joint is _______ to the plumb line when it is aligned.
Vertical line
Bed block
Perpendicular
Lintel
Correct!
Wrong!
Continue >>
If the soil is _______, a pile foundation is typically offered.
Made up
Soaked in water
Compressible
All options are correct
Correct!
Wrong!
Continue >>
The depth of soil exploration for large embankments and dams should not be less than _______.
1/2 h
2 h
h/4
h/8
Correct!
Wrong!
Continue >>
Choose one of the following to represent the false statement:
Before making lime mortar, lime should be slaked.
The walls are pointed with lime surkhi mortar.
The only purpose of adding cement to lime mortar is to improve its hydraulic qualities.
Concrete with a high early strength is typically utilized in cold climates.
Correct!
Wrong!
Continue >>
For beams and slabs, concrete slump should range from ________.
30 to 125 mm
40 to 100 mm
35 to 125 mm
45 to 100 mm
Correct!
Wrong!
Continue >>
________ are the best kind of piles for soft soil with little resistance to the flow of concrete.
Franki pile
Raymond pile
Vibro pile
Simplex pile
Correct!
Wrong!
Continue >>
_______ is a protruding element that is typically used to support a truss.
Frieze
Cornice
Lintel
Coping
Correct!
Wrong!
Continue >>
The soil's bearing capacity cannot be increased by
Making sand heaps
Watering the soil's surface
Ramming dirt with crushed stone
Removing subsurface water
Correct!
Wrong!
Continue >>
When drilling in ________, rotary drilling is the fastest method.
Clay soils
Sandy soil
Rocky soils
All of these
Correct!
Wrong!
Continue >>
Only after ____ days may the formwork on the underside of the slabs be removed.
5
7
12
14