Construction

Construction Test 1

0%

________ are the best kind of piles for soft soil with little resistance to the flow of concrete.

Correct! Wrong!

Only after ____ days may the formwork on the underside of the slabs be removed.

Correct! Wrong!

Choose one of the following to represent the false statement:

Correct! Wrong!

The soil's bearing capacity cannot be increased by

Correct! Wrong!

For spans, couple roof is used.

Correct! Wrong!

The depth of soil exploration for large embankments and dams should not be less than _______.

Correct! Wrong!

A cross joint is _______ to the plumb line when it is aligned.

Correct! Wrong!

For beams and slabs, concrete slump should range from ________.

Correct! Wrong!

If the soil is _______, a pile foundation is typically offered.

Correct! Wrong!

_______ is a protruding element that is typically used to support a truss.

Correct! Wrong!

When drilling in ________, rotary drilling is the fastest method.

Correct! Wrong!