What must occur before anyone on the ground approaches or touches a crane that has made contact with an energized overhead power line?
-
A
The crane operator must exit the cab first
-
B
The utility company must deenergize and confirm the line is safe
-
C
A site safety officer must give verbal clearance
-
D
The crane load must be set down first