Question 1: What is the minimum safe approach distance required by OSHA for crane operations near power lines energized at 50 kV or less?
- 5 feet
- 10 feet (Correct answer)
- 15 feet
- 20 feet
Correct answer: 10 feet
OSHA 29 CFR 1926.1408 requires a minimum clearance of 10 feet for power lines energized up to 50 kV.
Question 2: Before beginning crane operations near overhead power lines, what must the crane operator or employer determine first?
- Whether the crane is insulated
- The voltage of the power lines (Correct answer)
- The weight of the suspended load
- Whether a signal person is available
Correct answer: The voltage of the power lines
The voltage must be determined first because minimum approach distances are calculated based on the power line's voltage level.
Question 3: If a crane boom accidentally contacts an energized overhead power line, what should the crane operator do immediately?
- Exit the cab as quickly as possible
- Stay in the cab and call for emergency help (Correct answer)
- Ask ground workers to push the boom away
- Lower the load to the ground and then exit
Correct answer: Stay in the cab and call for emergency help
The crane cab acts as a Faraday cage; exiting creates a path for current through the operator's body to ground, so staying inside is safer until power is deenergized.
Question 4: Which OSHA standard governs crane and derrick operations in construction, including power line safety requirements?
- 29 CFR 1926.502
- 29 CFR 1926.1400 (Subpart CC) (Correct answer)
- 29 CFR 1910.179
- 29 CFR 1926.550
Correct answer: 29 CFR 1926.1400 (Subpart CC)
29 CFR 1926.1400 (Subpart CC), effective 2010, is the comprehensive OSHA standard governing cranes and derricks in construction including electrical hazard requirements.
Question 5: What minimum clearance distance does OSHA require when crane operations are conducted near power lines energized between 350 kV and 1,000 kV?
- 10 feet
- 25 feet
- 35 feet (Correct answer)
- 50 feet
Correct answer: 35 feet
OSHA 1926.1408 requires a minimum approach distance of 35 feet for power lines energized between 350 kV and 1,000 kV.
Question 6: Which device can be installed on a crane to warn the operator when the equipment is approaching an energized power line?
- Anti-two-block device
- Load moment indicator
- Proximity alarm (warning device) (Correct answer)
- Rated capacity indicator
Correct answer: Proximity alarm (warning device)
A proximity alarm (also called a proximity warning device) alerts the operator with an audible or visual signal when the crane is nearing the power line danger zone.
Question 7: If the voltage of nearby overhead power lines cannot be determined, what minimum clearance distance must be maintained during crane operations?
- 10 feet
- 15 feet
- 20 feet (Correct answer)
- 25 feet
Correct answer: 20 feet
OSHA 1926.1408(b) requires a minimum clearance of 20 feet when the voltage cannot be determined, to account for uncertainty.
Question 8: Under OSHA 1926.1408, who is responsible for notifying the utility company before crane work begins near overhead power lines?
- Only the crane operator
- The employer or controlling entity (Correct answer)
- The signal person
- The site safety officer
Correct answer: The employer or controlling entity
OSHA places the responsibility for contacting the utility owner/operator on the employer or controlling entity before crane operations begin near power lines.
Question 9: What is the purpose of an 'encroachment prevention plan' during crane operations near power lines?
- To document equipment maintenance schedules
- To establish procedures that prevent the crane from entering the power line danger zone (Correct answer)
- To outline emergency medical response steps
- To specify maximum load capacities near power lines
Correct answer: To establish procedures that prevent the crane from entering the power line danger zone
An encroachment prevention plan defines the methods, equipment, and procedures that will keep any part of the crane or load from entering the power line's minimum approach distance.
Question 10: Under what condition may a crane operate closer than standard OSHA minimum approach distances to overhead power lines?
- When the operator has more than 10 years of experience
- When the load weight is under 2,000 pounds
- When the utility owner deenergizes and visibly grounds the lines (Correct answer)
- When operations occur during daylight hours only
Correct answer: When the utility owner deenergizes and visibly grounds the lines
OSHA 1926.1408(d) permits reduced clearance only when the utility owner/operator has deenergized the power lines and visibly grounded them.
Question 11: What does 'equipotential zone' mean in the context of crane electrical safety?
- A zone where all electrical equipment is rated at the same voltage
- A protected area where all objects are at the same electrical potential, reducing shock risk (Correct answer)
- A zone where no electrical equipment is allowed
- An area designated for electrical testing only
Correct answer: A protected area where all objects are at the same electrical potential, reducing shock risk
An equipotential zone is created by bonding and grounding all conductive objects so they share the same electrical potential, preventing current flow through workers.
Question 12: Which of the following is NOT an acceptable primary safeguard against power line hazards during crane operations?
- Installing insulating sleeves on power lines
- Erecting physical insulating barriers
- Relying solely on a proximity warning device (Correct answer)
- Deenergizing and grounding the power lines
Correct answer: Relying solely on a proximity warning device
A proximity warning device alone is insufficient; OSHA requires it to be used in combination with other controls such as insulating barriers or deenergized lines.
Question 13: What should a signal person do immediately if a crane load begins to drift toward an overhead power line during a pick?
- Continue signaling to complete the lift as quickly as possible
- Immediately give the emergency stop signal (Correct answer)
- Signal to increase boom speed to pass by quickly
- Move toward the load to physically redirect it
Correct answer: Immediately give the emergency stop signal
At any sign of imminent encroachment on a power line, the signal person must immediately give the stop signal so all crane movement ceases.
Question 14: When a crane must operate within a power line's danger zone, OSHA requires that a dedicated spotter be assigned to watch for what?
- Load swing and rigging condition
- The crane's proximity to the energized power lines at all times (Correct answer)
- Ground crew positioning and foot traffic only
- Wind speed and weather changes
Correct answer: The crane's proximity to the energized power lines at all times
OSHA requires a dedicated spotter whose sole responsibility is monitoring the distance between the crane and energized power lines during all movements in the danger zone.
Question 15: What must occur before anyone on the ground approaches or touches a crane that has made contact with an energized overhead power line?
- The crane operator must exit the cab first
- The utility company must deenergize and confirm the line is safe (Correct answer)
- A site safety officer must give verbal clearance
- The crane load must be set down first
Correct answer: The utility company must deenergize and confirm the line is safe
No ground personnel should approach until the power company has deenergized the line and confirmed it is safe, because ground current and step potential remain hazards until then.
Question 16: What is 'step potential' in the context of crane electrical safety?
- The voltage rating of the crane's control system
- The voltage difference between two ground points that can drive current through a person's body from foot to foot (Correct answer)
- The potential energy stored in a raised load
- The step-down voltage from transmission to distribution lines
Correct answer: The voltage difference between two ground points that can drive current through a person's body from foot to foot
Step potential is the voltage gradient across the ground near an energized contact point that can cause lethal current to flow up one leg and down the other.
Question 17: The minimum approach distances listed in OSHA's power line safety tables are determined primarily by which factor?
- The weight of the load being lifted
- The height of the crane boom above ground
- The voltage level of the power line (Correct answer)
- The length of the rigging assembly
Correct answer: The voltage level of the power line
Minimum approach distances are voltage-dependent because higher voltage creates a larger arc-flash zone and requires more clearance to prevent electrical contact.
Question 18: What does OSHA 1926.1408 require when power line voltage information cannot be obtained before crane operations?
- Assume 50 kV and use the 10-foot clearance rule
- Suspend all operations until voltage is confirmed by the utility
- Maintain at least 20 feet of clearance from the lines (Correct answer)
- Require a licensed electrician on-site during lifts
Correct answer: Maintain at least 20 feet of clearance from the lines
When voltage cannot be determined, OSHA mandates a conservative default minimum clearance of 20 feet to account for the uncertainty.
Question 19: Which practice best protects a crane operator from 'touch potential' hazards if the crane contacts an energized power line?
- Wearing rubber-soled work boots
- Grounding the crane outriggers with copper cables
- Remaining inside the cab without touching external metal surfaces (Correct answer)
- Using fiber rope slings to isolate the load
Correct answer: Remaining inside the cab without touching external metal surfaces
Staying inside the cab avoids bridging the crane's energized body to ground through the operator's body; touching external metal while also touching the ground or cab floor creates a lethal path.
Question 20: Under OSHA 1926.1408, what assessment must be completed before lifting operations begin in any work zone containing overhead power lines?
- A licensed engineer must sign a rigging plan
- A determination must be made whether any part of equipment or load could enter the minimum approach distance during operations (Correct answer)
- The operator must hold a current medical clearance certificate
- Insurance documentation must be submitted to the project owner
Correct answer: A determination must be made whether any part of equipment or load could enter the minimum approach distance during operations
OSHA requires a pre-operation assessment to determine if the equipment, load, or rigging could encroach on the minimum approach distance at any point during the lift.
Question 21: If an operator must evacuate a crane that is in contact with an energized power line, what technique minimizes the risk from step potential?
- Step down carefully using the access ladder and walk away quickly
- Jump clear of the crane with feet together, then shuffle or hop away in small steps (Correct answer)
- Lower the boom to the ground to create a ground path before exiting
- Call for a fiberglass ladder to be brought to the cab door
Correct answer: Jump clear of the crane with feet together, then shuffle or hop away in small steps
Jumping clear with feet together and shuffling or taking small hops minimizes the voltage difference between the two foot contact points, reducing step potential shock hazard.
What is the minimum safe approach distance required by OSHA for crane operations near power lines energized at 50 kV or less?
What Practice Test Geeks adds beyond an AI chat for OSHA
An AI chatbot can quiz you, but it can't reproduce the exam conditions or keep your record. Here you get:
- A timed, full-length OSHA mock exam โ 90 questions in 90 minutes with a 70% pass mark, modeled on the official exam's question count and time limit, followed by a score report broken down by exam domain.
- A fixed OSHA question bank: the same test every attempt, so your score is comparable from one try to the next instead of changing with every regenerated quiz.
- Progress saved on your device: completed tests, scores and missed questions stay in My Progress, so you can retake only what you got wrong.
- A printable OSHA cheat sheet you can print or save as a PDF.
- OSHA flashcards built from the same question bank.
Practice questions written with AI assistance and published by Nathan Beja, founder of Practice Test Geeks. They are not real exam questions. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy