When testing a mass notification system (MNS) integrated with a fire alarm system, the test must verify that the MNS takes priority over:
-
A
Trouble signals only
-
B
Both alarm and supervisory signals
-
C
Fire alarm evacuation signals when activated by an authorized operator
-
D
Secondary power sources