What is the purpose of a 'soldier pile and lagging' wall system in excavation support?
-
A
To pump groundwater from the excavation perimeter
-
B
To retain soil using vertical steel H-piles with horizontal timber lagging inserted between them
-
C
To support temporary scaffolding around a deep excavation
-
D
To anchor the shoring system to adjacent structures