General Contractor License Exam (Business & Law Portion) — Questions and Answers
Question 1: OSHA's 300 Log must be kept on file for how long?
- 3 years
- 5 years (Correct answer)
- 1 year
- 10 years
Correct answer: 5 years
Employers must retain OSHA 300 Logs, 301 Incident Reports, and 300A Summary forms for 5 years following the end of the calendar year they cover.
Question 2: A general contractor is choosing a business structure. They want to protect their personal assets from business debts and lawsuits but also want to avoid the double taxation that can occur with a C Corporation. Which business structure would be most suitable?
- C Corporation
- General Partnership
- Sole Proprietorship
- S Corporation (Correct answer)
Correct answer: S Corporation
An S Corporation provides the liability protection of a corporation, separating the owner's personal assets from the business's debts. However, it is a pass-through entity, meaning profits and losses are passed directly to the owners' personal tax returns, avoiding the corporate-level income tax that C Corporations face (double taxation).
Question 3: When issuing a Notice to Proceed (NTP) to a subcontractor, the general contractor should ensure:
- The NTP is verbal to maintain flexibility
- Permits are not yet required at this stage
- The subcontractor has begun work already to save time
- The subcontract is fully executed, insurance certificates received, and any required bonds are in place (Correct answer)
Correct answer: The subcontract is fully executed, insurance certificates received, and any required bonds are in place
Issuing an NTP before the subcontract is executed or insurance/bonds are confirmed exposes the general contractor to unprotected liability and contract disputes.
Question 4: What does the term 'cut and fill' refer to in site grading operations?
- Cutting utility lines and filling them with conduit
- Removing topsoil and replacing it with engineered fill
- Excavating high areas and using that material to fill low areas to achieve desired grade (Correct answer)
- Cutting tree stumps and filling the holes with gravel
Correct answer: Excavating high areas and using that material to fill low areas to achieve desired grade
Cut and fill balances earthwork by excavating (cutting) elevated areas and using that soil to raise (fill) lower areas, minimizing the need to import or export material.
Question 5: A contractor wants to determine if a project is profitable mid-job. Which document provides the best real-time comparison of budgeted vs. actual costs?
- General ledger
- Accounts payable aging report
- Balance sheet
- Job cost report (Correct answer)
Correct answer: Job cost report
A job cost report compares estimated costs to actual costs incurred, allowing mid-project profitability analysis by cost category.
Question 6: A contractor discovers archaeological artifacts while excavating. What is the required immediate action?
- Remove artifacts and store them on-site
- Continue excavating carefully to document the find
- Stop work, secure the area, and notify the appropriate authorities (Correct answer)
- Photograph the artifacts and resume work
Correct answer: Stop work, secure the area, and notify the appropriate authorities
Federal and state laws (including the National Historic Preservation Act) require stopping work and notifying authorities when suspected archaeological or cultural resources are discovered.
Question 7: A worker is tasked with servicing a permanently installed air conditioning unit. To comply with Lockout/Tagout (LOTO) standards, what is the critical first step in the process?
- Apply the lock and tag to the disconnect switch.
- Verify that the system is de-energized by trying to start it.
- Immediately begin the repair to minimize downtime.
- Notify all affected employees that the equipment will be shut down for service. (Correct answer)
Correct answer: Notify all affected employees that the equipment will be shut down for service.
The first step in the LOTO procedure is preparation, which includes identifying all energy sources and notifying all affected employees of the impending shutdown. This ensures that no one attempts to operate the equipment while it is being serviced. Applying the lock, verifying isolation, and performing the work all come after notification and shutdown.
Question 8: A worker suffers an amputation on a construction site. How quickly must the general contractor report this incident to OSHA?
- Within 72 hours
- Within 24 hours (Correct answer)
- Within 8 hours
- Within 48 hours
Correct answer: Within 24 hours
OSHA requires that any work-related amputation, inpatient hospitalization, or loss of an eye be reported within 24 hours.
Question 9: A project schedule has several activity paths. Path A has a total duration of 45 days. Path B has a duration of 52 days. Path C has a duration of 48 days. All paths must be completed. What is the minimum time required to complete the project?
- 45 days
- 52 days (Correct answer)
- 48 days
- 145 days
Correct answer: 52 days
The minimum time to complete a project is determined by its critical path, which is the longest duration path through the network of activities. In this scenario, Path B is the longest at 52 days, making it the critical path and defining the shortest possible project duration.
Question 10: In project scheduling, which of the following best describes the 'Critical Path'?
- The longest sequence of dependent tasks that determines the minimum project duration. (Correct answer)
- The shortest sequence of tasks through the project network.
- The most expensive sequence of tasks in the project.
- The sequence of tasks with the most float or slack time.
Correct answer: The longest sequence of dependent tasks that determines the minimum project duration.
The Critical Path Method (CPM) identifies the longest sequence of dependent tasks through a project. Any delay in an activity on the critical path will directly delay the entire project's completion. Tasks on this path have zero float or slack.
Question 11: A contractor wants to add a new license classification to their existing license. They typically must:
- Pass a trade examination relevant to the new classification (Correct answer)
- Obtain a separate business entity license
- Wait for the next license renewal cycle to request the change
- Simply notify the licensing board in writing
Correct answer: Pass a trade examination relevant to the new classification
Adding a classification generally requires demonstrating competency in the new trade, usually through a separate examination covering that classification.
Question 12: Which type of pipe is most commonly required by code for natural gas supply lines inside a residential structure?
- CPVC
- PVC schedule 40
- PEX tubing
- Black steel pipe (Correct answer)
Correct answer: Black steel pipe
Black steel pipe is the standard code-approved material for interior natural gas supply lines because it is durable and does not corrode from gas contact.
Question 13: A superintendent's PRIMARY responsibility on a construction site is to:
- Negotiate change orders with the owner
- Direct and coordinate daily field operations, subcontractors, and workforce to execute the work per plans and schedule (Correct answer)
- Handle all permit applications
- Process all pay applications for subcontractors
Correct answer: Direct and coordinate daily field operations, subcontractors, and workforce to execute the work per plans and schedule
The superintendent is the on-site manager responsible for daily construction activities, quality control, safety compliance, and coordinating subcontractors to meet project milestones.
Question 14: What distinguishes an 'express warranty' from an 'implied warranty' in a construction contract?
- Express warranties are oral; implied warranties are written
- Implied warranties last longer than express warranties
- Express warranties only cover materials, not workmanship
- Express warranties are explicitly stated; implied warranties arise by law or custom (Correct answer)
Correct answer: Express warranties are explicitly stated; implied warranties arise by law or custom
An express warranty is one the contractor explicitly states in the contract, while an implied warranty arises automatically by law, such as the implied warranty of habitability.
Question 15: A general contractor is creating a Work Breakdown Structure (WBS) for a custom home build. Which of the following is the primary purpose of developing a WBS?
- To create a marketing brochure for the finished home.
- To hire all the necessary subcontractors for the job.
- To break down the total project scope into smaller, more manageable work packages. (Correct answer)
- To finalize the construction contract with the property owner.
Correct answer: To break down the total project scope into smaller, more manageable work packages.
The primary purpose of a Work Breakdown Structure (WBS) is to hierarchically decompose the total scope of a project into manageable sections or 'work packages'. This allows for better planning, cost estimating, scheduling, and control.
Question 16: Which of the following best describes the primary goal of concrete curing?
- To increase the surface hardness for better wear resistance.
- To accelerate the drying of the concrete surface.
- To remove excess water from the concrete mix.
- To maintain satisfactory moisture and temperature conditions. (Correct answer)
Correct answer: To maintain satisfactory moisture and temperature conditions.
Curing is the process of maintaining adequate moisture and temperature in freshly placed concrete for a period of time to allow for proper cement hydration. This process is critical for the concrete to achieve its designed strength, durability, and other potential properties. It is not about drying the concrete, but rather controlling the rate of moisture loss.
Question 17: When preparing a job cost report, 'cost to complete' refers to:
- The original contract price minus profit
- Estimated remaining costs needed to finish the project (Correct answer)
- Total costs spent on the project to date
- Overhead costs allocated to the job
Correct answer: Estimated remaining costs needed to finish the project
Cost to complete is the projected amount still needed to finish the project, used to forecast final job profitability.
Question 18: Under the NEC, what is the maximum circuit breaker size permitted for a 20-ampere-rated, 120V household receptacle circuit using 12 AWG copper wire?
- 15 amperes
- 20 amperes (Correct answer)
- 25 amperes
- 30 amperes
Correct answer: 20 amperes
12 AWG copper wire has an ampacity that permits a maximum 20-ampere overcurrent device for a standard 120V branch circuit under the NEC.
Question 19: What is the primary purpose of holding regular toolbox talks on a construction site?
- To provide a forum for workers to negotiate wages.
- To review the overall project budget with the entire crew.
- To assign daily work tasks to each individual worker.
- To discuss specific job-site safety hazards and reinforce safe work practices. (Correct answer)
Correct answer: To discuss specific job-site safety hazards and reinforce safe work practices.
Toolbox talks (or safety talks) are short, informal safety meetings held on-site. Their main purpose is to regularly communicate and reinforce safety awareness by focusing on specific hazards relevant to the current work being performed, promoting a strong safety culture.
Question 20: In many states, before a construction project begins, a legal document is filed with the county recorder to officially signal the start date of the project. This document protects the owner by defining the start time for mechanic's lien rights and identifying key stakeholders. What is this document called?
- Notice of Commencement (Correct answer)
- Certificate of Occupancy
- Notice of Completion
- Building Permit
Correct answer: Notice of Commencement
A Notice of Commencement (NOC) is a formal document filed at the beginning of a project that establishes the official start date. It provides key information about the project owner, contractor, and property, and its filing is crucial for establishing the priority of lien rights for all parties involved in the construction process.
Question 21: Under the percentage-of-completion accounting method, revenue is recognized:
- Only when the project reaches final completion
- At the start of the contract
- When the client makes each scheduled payment
- Based on the proportion of work completed to date (Correct answer)
Correct answer: Based on the proportion of work completed to date
Percentage-of-completion recognizes revenue proportionally as work progresses, matching revenue with costs incurred.
Question 22: Which of the following financial statements provides a snapshot of a construction company's assets, liabilities, and equity at a specific point in time?
- Work-in-Progress (WIP) Report
- Cash Flow Statement
- Income Statement
- Balance Sheet (Correct answer)
Correct answer: Balance Sheet
The Balance Sheet is the financial statement that summarizes a company's assets (what it owns), liabilities (what it owes), and owner's equity at a particular moment. It represents the equation: Assets = Liabilities + Equity.
Question 23: Find the right phrase to match the definition below: someone who has agreed to take on another's obligations, particularly someone who takes on debts or obligations in the case of default. <br>
- Surety (Correct answer)
- Quittance
- Compensation
- Privity
Correct answer: Surety
A surety is an individual or entity that legally agrees to be responsible for the fulfillment of another party's obligations, especially financial debts or contractual duties, in the event of their default. In construction, a surety bond guarantees that a contractor will complete a project according to the contract terms. If the contractor fails to perform, the surety is then obligated to ensure the project's completion or compensate the owner.
Question 24: Which lumber grade designation indicates the highest structural quality for dimensional framing lumber?
- No. 2
- Select Structural (Correct answer)
- No. 1
- Construction Grade
Correct answer: Select Structural
Select Structural is the highest grade for dimensional lumber, offering the best combination of strength, stiffness, and appearance with minimal defects.
Question 25: Under most state laws, who is responsible for ensuring that subcontractors on a project are properly licensed?
- The local building department
- The general contractor (Correct answer)
- The property owner alone
- The subcontractors themselves, with no general contractor liability
Correct answer: The general contractor
The general contractor is generally responsible for verifying that all subcontractors they hire hold the appropriate licenses for their trade.
Question 26: Which of the following activities is a key component of the project closeout phase?
- Submitting the final bid package to the owner.
- Creating the preliminary construction schedule.
- Developing the initial project budget.
- Delivering as-built drawings and owner's manuals. (Correct answer)
Correct answer: Delivering as-built drawings and owner's manuals.
Project closeout is the final phase of a construction project. A critical task during this phase is handing over all necessary documentation to the owner, which includes as-built drawings (revised plans showing all changes made during construction), and operation and maintenance (O&M) manuals for installed equipment. The other options occur during the pre-construction or bidding phases.
Question 27: Which method is used to measure project performance by comparing earned value to planned value and actual cost?
- S-curve forecasting only
- Break-even analysis
- Earned Value Management (EVM) (Correct answer)
- Benefit-cost ratio
Correct answer: Earned Value Management (EVM)
EVM integrates scope, schedule, and cost to objectively measure project performance using metrics like Schedule Performance Index (SPI) and Cost Performance Index (CPI).
Question 28: Select the term that best describes the definition of the following definition: term used to define hand-operated, portable and stationary firefighting equipment for use in buildings. The phrase also refers to fire hose reels, internal fire hydrants, fire service hose, and nozzles in addition to fire extinguishers that use water, carbon dioxide, foam, and dry powder. <br>
- FEXT (Correct answer)
- FSPR
- FRSA
- ASHRAE
Correct answer: FEXT
FEXT is an acronym that refers to Fire EXtinction Technology or equipment, encompassing various hand-operated, portable, and stationary firefighting devices used in buildings. This includes not only fire extinguishers (water, CO2, foam, dry powder) but also fire hose reels, internal fire hydrants, and associated hoses and nozzles. It describes the comprehensive range of immediate fire suppression tools available within a structure.
Question 29: When is a safety harness inspection required before use on a construction site?
- Only after a fall arrest event
- Before each use by the worker and annually by a competent person (Correct answer)
- Monthly by a qualified person
- Quarterly by the equipment manufacturer
Correct answer: Before each use by the worker and annually by a competent person
OSHA requires workers to inspect their personal fall arrest equipment before each use, and a competent person must conduct formal inspections at least annually.
Question 30: A general contractor is creating a construction schedule for a new single-family home. Which scheduling method identifies the sequence of tasks that determines the shortest possible project duration, where a delay in any task on this path will delay the entire project?
- Critical Path Method (CPM) (Correct answer)
- Line of Balance
- Gantt Chart
- Program Evaluation and Review Technique (PERT)
Correct answer: Critical Path Method (CPM)
The Critical Path Method (CPM) is a scheduling technique that identifies the longest sequence of dependent tasks (the 'critical path') through the project. This path determines the minimum time to complete the project. Any delay to a task on the critical path will directly extend the project's completion date.
Question 31: During a weekly site inspection, a supervisor notices a subcontractor's crew is working on a scaffold that has not been erected according to OSHA standards. What is the supervisor's most appropriate immediate action?
- Issue a written warning to the subcontractor to be addressed within 24 hours.
- Take photos for documentation and discuss them at the next safety meeting.
- Report the issue to the general contractor's main office at the end of the day.
- Order the workers to stop work immediately and get down from the scaffold. (Correct answer)
Correct answer: Order the workers to stop work immediately and get down from the scaffold.
When an imminent danger is identified, such as an improperly erected scaffold, the supervisor's first responsibility is to remove the workers from the hazardous situation immediately to prevent injury. All other actions, such as documentation and formal communication, should follow after the immediate threat to safety has been neutralized.
Question 32: An owner wants to use a design-build contract instead of a traditional design-bid-build approach. What is the main legal difference for the contractor?
- The owner retains design liability but transfers construction liability
- The contractor is not responsible for any design errors
- The contractor assumes responsibility for both design and construction (Correct answer)
- The contractor must be licensed as an architect in the state
Correct answer: The contractor assumes responsibility for both design and construction
In design-build, the single entity (contractor or design-builder) is responsible for both the design and construction, consolidating liability and eliminating the traditional separation between designer and builder.
Question 33: During the estimating process for a renovation project, a contractor adds a specific amount of money to the budget to cover unforeseen issues, such as discovering hidden water damage or unexpected price increases for materials. What is this budgeted amount called?
- Overhead
- Contingency (Correct answer)
- Retainage
- Profit Margin
Correct answer: Contingency
A contingency is an amount of money set aside in a project budget to cover unexpected costs, risks, or changes that may arise during construction. It acts as a financial buffer for unforeseen events.
Question 34: What is the definition of a conceptual estimate?
- An estimate based on blue-prints.
- An estimate based on blue-prints.
- A preliminary estimate based on the owner's ideas of design. (Correct answer)
- It is the actual budget for the project developed by an architectural/engineering firm.
Correct answer: A preliminary estimate based on the owner's ideas of design.
A conceptual estimate is an early-stage cost projection for a project, developed before detailed plans are available. It relies on the owner's initial ideas, scope, and general design concepts to provide a rough but useful approximation of potential costs for feasibility studies.
Question 35: A public works project worth $500,000 requires bidders to be licensed. An unlicensed contractor submits the lowest bid. The awarding agency should:
- Award the contract contingent on the contractor obtaining a license within 60 days
- Allow the contractor to subcontract all work to a licensed firm
- Reject the bid as non-responsive due to lack of licensure (Correct answer)
- Award the contract since the lowest bid saves taxpayer money
Correct answer: Reject the bid as non-responsive due to lack of licensure
A bid from an unlicensed contractor on a project requiring licensure is non-responsive and must be rejected, regardless of bid price.
Question 36: A construction crew is working in a trench that is 8 feet deep. The excavated soil and other materials are piled at the edge of the trench. What is the minimum distance that these spoil piles must be kept from the edge of the excavation?
- 5 feet
- 1 foot
- 4 feet
- 2 feet (Correct answer)
Correct answer: 2 feet
OSHA standard 29 CFR 1926.651(j)(2) requires that excavated materials, equipment, and other potential falling hazards be kept at least 2 feet from the edge of excavations to prevent them from falling or rolling into the trench and endangering workers.
Question 37: Which project delivery method gives the owner a single point of responsibility for both design and construction?
- Design-Bid-Build (DBB)
- Multiple Prime Contracting
- Design-Build (DB) (Correct answer)
- Construction Manager at Risk (CMAR)
Correct answer: Design-Build (DB)
In Design-Build, one entity holds contracts for both design and construction, creating a single point of accountability for schedule, cost, and quality.
Question 38: A contractor who is owed money files a mechanics lien. What is the deadline typically tied to for filing a mechanics lien in most states?
- A fixed period after the last date of furnishing labor or materials (Correct answer)
- 30 days after the contractor is hired
- The date the contractor submits a final invoice
- 90 days after the building permit is issued
Correct answer: A fixed period after the last date of furnishing labor or materials
Most state mechanics lien statutes require filing within a specified number of days (commonly 30-90) after the claimant last furnished labor or materials to the project.
Question 39: A supported scaffold on a construction site will be used by workers during the next shift. According to OSHA regulations, who must inspect the scaffold and when must this inspection occur?
- A competent person, before each work shift. (Correct answer)
- A project manager, at the end of each week.
- The site superintendent, only after it is first erected.
- A qualified engineer, at the beginning of the project.
Correct answer: A competent person, before each work shift.
OSHA standard 29 CFR 1926.451(f)(3) mandates that scaffolds and their components be inspected for visible defects by a competent person before each work shift and after any event that could affect the scaffold's structural integrity.
Question 40: A contractor is in the very early stages of planning a project, before detailed architectural drawings are available. The client needs a rough cost projection to determine if the project is financially viable. Which type of estimate is most appropriate at this stage?
- A quantity takeoff estimate
- A bid estimate
- A conceptual estimate (Correct answer)
- A detailed estimate
Correct answer: A conceptual estimate
A conceptual estimate (also known as a preliminary or order-of-magnitude estimate) is used in the earliest stages of a project for feasibility studies. It relies on historical data and broad metrics, like cost per square foot, because detailed design information is not yet available.
Question 41: Which scheduling technique identifies the longest path through a project network and determines the minimum project duration?
- Critical Path Method (CPM) (Correct answer)
- Monte Carlo simulation
- Gantt chart analysis
- Resource leveling
Correct answer: Critical Path Method (CPM)
CPM calculates early and late start/finish times for each activity, identifying the sequence of tasks that controls the project's total duration.
Question 42: A contractor's net profit margin is 5% on a $2,000,000 project. What is the net profit?
- $10,000
- $100,000 (Correct answer)
- $200,000
- $50,000
Correct answer: $100,000
Net profit = Revenue × Profit margin: $2,000,000 × 5% = $100,000.
Question 43: A general contractor is working in a confined space that contains a toxic atmosphere. Which permit-required confined space entry element is being addressed by testing the air before entry?
- Atmospheric testing and monitoring (Correct answer)
- Attendant responsibilities
- Rescue service coordination
- Lockout/tagout procedures
Correct answer: Atmospheric testing and monitoring
Atmospheric testing and monitoring is a core permit-required confined space requirement that must be completed before and during entry to detect hazardous conditions.
Question 44: An owner withholds 10% of each progress payment until project completion. This withheld amount is called:
- Retainage (Correct answer)
- Mobilization fee
- Liquidated damages
- Contingency reserve
Correct answer: Retainage
Retainage is a percentage of earned payment withheld by the owner as security to ensure the contractor completes the work satisfactorily.
Question 45: What is another word for saber saw?
- Drywall cutter
- Builders saw
- Reciprocating saw
- Portable electric jig saw (Correct answer)
Correct answer: Portable electric jig saw
A saber saw is a common name for a jig saw, which is a portable electric tool designed for cutting intricate curves and shapes in various materials. The term 'portable electric jig saw' accurately describes its function as a handheld, electrically powered saw used for detailed, often curvilinear, cuts. It differentiates it from other types of saws like drywall cutters or larger builders saws.
Question 46: A contractor is preparing a bid for a commercial building. The process of meticulously measuring and listing all the materials, labor, and equipment required from the construction drawings and specifications is known as:
- Quantity Takeoff (Correct answer)
- Value Engineering
- Scope Creep Analysis
- Project Scheduling
Correct answer: Quantity Takeoff
A quantity takeoff (QTO) is the detailed process of measuring and itemizing all the resources (materials, labor, equipment) needed to complete a project based on the design documents. It is a fundamental step in creating an accurate cost estimate and bid.
Question 47: What is not required on a Home Renovation Contract?
- A statement that the owner can require a Performance and Payment Bond, a notice, in at least 10 point print, in close proximity to the signature
- A list of all personnel’s name and home address that is listed on the license (Correct answer)
- The approximate date of when the work is to begin and when it will be substantially completed
- A description of the work that will be done, the materials used or installed and the equipment used or installed
Correct answer: A list of all personnel’s name and home address that is listed on the license
Home renovation contracts typically require detailed information about the project scope, costs, timelines, and the contractor's license number. However, they do not require a list of all personnel's names and home addresses that are listed on the license. This information is considered private and is not a standard requirement for the contract itself.
Question 48: Under OSHA's struck-by hazard standards, what color must a hard hat be for a site safety officer to be easily identified on a construction site by convention?
- Yellow
- White
- Orange
- Green (Correct answer)
Correct answer: Green
While not mandated by OSHA, industry convention designates green hard hats for safety officers and inspectors to make them easily identifiable on site.
Question 49: Select the appropriate term from the definition below: ______ happens in loosely packed saturated sand when seismic shaking compacts the sand, increasing the surrounding water's pressure. The sand grains bear no net pressure and can pass one another because the water's pressure can increase to the point where it absorbs all of the stress in the soil. <br>
- Liquefaction (Correct answer)
- Indemnification
- Dissipation
- Saturation
Correct answer: Liquefaction
Liquefaction is a phenomenon that occurs in saturated, loose granular soils, typically during seismic shaking. The shaking causes the soil particles to rearrange and compact, leading to a rapid increase in pore water pressure. When this pressure becomes high enough to absorb all the stress in the soil, the sand grains lose contact and the soil temporarily loses its strength and stiffness, behaving like a liquid.
Question 50: When a project owner issues a 'Notice of Termination for Convenience,' the contractor is generally entitled to:
- Full contract value including work not yet performed
- Only direct material costs, not overhead or profit
- Nothing, because the owner can terminate without compensation
- Recovery of costs incurred to date, a reasonable profit on work performed, and demobilization costs (Correct answer)
Correct answer: Recovery of costs incurred to date, a reasonable profit on work performed, and demobilization costs
A termination for convenience clause allows owners to end the contract without cause but requires fair compensation for work performed, profit on completed work, and reasonable wind-down costs.
Question 51: A subcontractor fails to complete work and causes a project delay. Under a typical subcontract agreement, the general contractor may:
- Withhold all future payments permanently
- Back-charge the subcontractor for resulting costs (Correct answer)
- Terminate all subcontracts on the project
- File a mechanics lien against the subcontractor
Correct answer: Back-charge the subcontractor for resulting costs
Back-charges allow the GC to deduct costs incurred due to a subcontractor's default from amounts owed to that subcontractor.
Question 52: Which document specifies the required compaction percentage for engineered fill on a construction project?
- Survey plat
- Zoning variance
- Building permit
- Geotechnical (soils) report (Correct answer)
Correct answer: Geotechnical (soils) report
The geotechnical or soils report prepared by a licensed engineer specifies required compaction percentages, typically expressed as a percentage of Modified Proctor density.
General Contractor License Exam (Business & Law Portion)
This exam certifies individuals in the business and legal aspects of operating a general contracting business, covering regulations, contracts, and financial management.
Exam Rules
- You can skip questions and return to them later
- Flag questions for review before submitting
- No feedback shown until you submit the entire exam
- Unanswered questions count as wrong — answer everything
- 10 pretest questions are mixed in and don't affect your score
- Timer auto-submits when time runs out
- Your progress is auto-saved every 30 seconds
Practice questions written with AI assistance and published by Nathan Beja, founder of Practice Test Geeks. They are not real exam questions. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- cslb.ca.gov — Fees, renewal · verified Oct 2026
- web.cslb.ca.gov — Test delivery, exam format, retake policy, score release, score validity · verified Oct 2026
- test-takers.psiexams.com — Exam format, passing score, retake policy, score release, time limit, score validity · verified Oct 2026
- psiexams.com — Eligibility · verified Oct 2026
- www2.myfloridalicense.com — Registration deadline, exam format, passing score, test delivery · verified Oct 2026