What is 'residual risk' in the context of workplace hazard management?
-
A
The risk eliminated entirely by engineering controls
-
B
The risk that remains after all feasible controls have been implemented
-
C
The initial risk identified before any analysis is conducted
-
D
The risk that has been formally transferred to a third-party contractor