A technician is installing a CNG fuel system on a vehicle. According to NFPA 52, what is the minimum required clearance between a CNG fuel line and the engine exhaust system?
-
A
1 inch (25 mm)
-
B
3 inches (75 mm)
-
C
6 inches (150 mm)
-
D
9 inches (225 mm)