When AWS D1.1 requires a prequalified WPS, which condition would disqualify it from prequalified status?
-
A
Using a listed base metal in Table 3.1
-
B
Exceeding the maximum interpass temperature for the process
-
C
Using a prequalified joint design within dimensional limits
-
D
Employing a qualified welder for the specified process