A Six Sigma Black Belt notices that a process capability index (Cpk) is 1.0 while Cp is 1.5. What does this indicate?
-
A
The process is centered within specification limits
-
B
The process mean has shifted away from the target
-
C
The specification limits are too wide
-
D
The sample size is insufficient