A Six Sigma Black Belt notices that all plotted points on an X-bar chart fall within the control limits but seven consecutive points are above the center line. What should be concluded?
-
A
The process is in statistical control
-
B
A special cause of variation is likely present
-
C
The control limits need to be recalculated
-
D
The sample size is too small