Read the first 7 Load Handling & Rigging Techniques flashcards as text
  1. Four-leg sling, 20,000 lb load, legs at 45° from horizontal, and only two legs assumed to carry the load. What is the approximate tension per loaded leg?

    Answer: 14,140 lb

    Each loaded leg carries 10,000 lb × the 45° factor of 1.414, which is about 14,140 lb.

  2. For a rotation-resistant wire rope, what broken-wire count triggers removal under OSHA 1926.1413?

    Answer: 2 broken wires within 6 rope diameters or 4 within 30 rope diameters

    Rotation-resistant rope has stricter limits, with removal at 2 broken wires in 6 diameters or 4 in 30 diameters.

  3. In a tandem (two-crane) lift, what is the most important planning concern?

    Answer: Ensuring neither crane is overloaded as load shares shift during movement

    Load distribution changes as the cranes move, so a tandem lift needs a plan and coordinated control to keep each crane within capacity.

  4. When a choker hitch's angle of choke is less than 120°, what happens to the sling's rated capacity?

    Answer: It decreases

    A sharper choke angle puts more stress on the sling, so its rated capacity must be reduced.

  5. Which is a removal criterion for a wire rope sling?

    Answer: Kinking, birdcaging, or crushing

    Kinks, birdcaging, and crushing are structural distortions that require removal from service.

  6. What is the best practice for using a screw-pin shackle where the load or sling might rotate the pin?

    Answer: Use a bolt-type shackle with nut and cotter pin instead

    Rotation can unscrew a screw pin, so a bolt-type shackle with nut and cotter pin is the secure choice.

  7. What is the correct way to use a sling's identification tag before a lift?

    Answer: Verify the rated load for the hitch you will use; remove the sling if the tag is missing or illegible

    Slings must carry legible rated-load identification, and a sling without it must be taken out of service.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. osha.gov — Score validity · verified Nov 2026
  2. nccco.org — Test delivery, renewal, score release, eligibility, fees, exam format, time limit, score validity · verified Nov 2026