Which condition requires an immediate shutdown of a tower crane and notification of the competent person?
-
A
A sudden load swing of more than 10 degrees during travel
-
B
Discovery of a broken wire rope strand exceeding ASME B30.3 removal-from-service criteria
-
C
Wind gusts exceeding 10 mph during a critical lift
-
D
The counterweight shifting 2 inches from its original position