Before a mobile crane operator accepts a lift assignment, the operator MUST verify:
-
A
The lift plan has been approved by the crane manufacturer
-
B
The weight of the load and rigging, the pick radius, and the crane configuration capacity
-
C
That a spotter is stationed at least 50 feet from the crane
-
D
The color code on the rigging matches the load's SWL tag