When an LMI system displays a load percentage of 95%, what should the crane operator do?
-
A
Proceed normally since the load is under 100%
-
B
Slow all crane movements and prepare to stop operations
-
C
Immediately shut down the crane
-
D
Increase boom angle to reduce the load percentage