Metal gas piping in a building must be bonded per NEC 250.104(B) to which of the following?
-
A
The nearest grounding rod
-
B
The equipment grounding conductor of the circuit likely to energize the piping
-
C
The cold water pipe at the water heater
-
D
The main service panel neutral bar only