A GIS analyst in North America overlays two vector datasets of a county boundary. One dataset is referenced to the North American Datum of 1927 (NAD27) and the other is referenced to the North American Datum of 1983 (NAD83). The analyst observes a consistent spatial offset of approximately 40 meters between the two layers. What is the most appropriate step to resolve this discrepancy?
-
A
Change the map projection of one layer to match the other.
-
B
Perform a datum transformation on one of the datasets.
-
C
Adjust the linear units of one layer from feet to meters.
-
D
Recalculate the feature geometry using a different spheroid model.