A GIS analyst is preparing data for a regional watershed analysis project. The analysis requires precise area calculations and distance measurements in meters. The source data is currently stored in a Geographic Coordinate System (GCS). Which of the following steps is essential for the analyst to perform before conducting the analysis?
-
A
Assign a new datum to the existing GCS.
-
B
Convert the data's angular units from degrees to radians.
-
C
Project the data into a suitable Projected Coordinate System (PCS).
-
D
Increase the resolution of the raster data layers.