A CCIL certified laboratory's internal audit reveals that several compression machines were tested for force verification using a load cell that was past its calibration due date. According to ISO/IEC 17025 principles of corrective action, what is the most critical initial step the laboratory must take?
-
A
Immediately recalibrate the load cell and reverify the compression machines.
-
B
Evaluate the significance of the nonconforming work and its potential impact on previous concrete strength test results.
-
C
Discipline the technician responsible for using the out-of-date load cell.
-
D
Update the internal audit schedule to increase the frequency of equipment checks.