Numeracy: Calculations Flashcards
6 cards from real TOWES practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Numeracy: Calculations flashcards as text
A machinist needs to cut a 4.5-foot piece of steel from a 12-foot stock bar. After the cut is made, how much of the stock bar will be left?
Answer: 7.5 feet
To find the remaining length of the stock bar, subtract the length of the piece being cut from the original length: 12 feet - 4.5 feet = 7.5 feet.
A quality control inspector checks a batch of 500 widgets and finds that 15 are defective. What percentage of the batch is defective?
Answer: 3%
To find the percentage, divide the number of defective widgets by the total number of widgets in the batch, and then multiply by 100. (15 ÷ 500) * 100 = 0.03 * 100 = 3%.
A carpenter is purchasing supplies. She buys 3 lengths of lumber at $12.50 each and 2 boxes of screws at $8.75 each. What is the total cost of the supplies before tax?
Answer: $55.00
First, calculate the cost of the lumber: 3 * $12.50 = $37.50. Next, calculate the cost of the screws: 2 * $8.75 = $17.50. Finally, add the two amounts together for the total cost: $37.50 + $17.50 = $55.00.
A machine operator produced the following number of units over a five-day work week: Monday (150), Tuesday (165), Wednesday (158), Thursday (162), Friday (145). What was the average number of units produced per day?
Answer: 156
To find the average, first sum the total units produced: 150 + 165 + 158 + 162 + 145 = 780. Then, divide the total by the number of days (5): 780 ÷ 5 = 156 units per day.
A warehouse worker needs to pack 460 small items into boxes. Each box can hold exactly 24 items. How many full boxes can be packed, and how many items will be left over?
Answer: 19 boxes and 4 items left over
Divide the total number of items by the box capacity: 460 ÷ 24 = 19.166... This indicates 19 full boxes. To find the remainder, multiply the number of full boxes by the capacity (19 * 24 = 456) and subtract this from the total number of items (460 - 456 = 4).
An employee's time card shows the following hours worked: Monday: 7.5, Tuesday: 8, Wednesday: 6.5, Thursday: 8.25, Friday: 4. What is the total number of hours the employee worked for the week?
Answer: 34.25 hours
To find the total hours, add the hours worked each day: 7.5 + 8 + 6.5 + 8.25 + 4 = 34.25 hours.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- bowvalleycollege.ca — Exam information · verified Nov 2026
- canada.ca — Test delivery, eligibility, score release · verified Nov 2026