Passing the TN LLE (Limited Licensed Electrician) exam is your first step toward a rewarding trade career in Tennessee. Our free TN LLE practice test is designed to help you master the National Electrical Code (NEC) and state-specific regulations required for licensure.
Whether you are aspiring to become a Nashville electrician or working towards your limited licensed electrician certification in Memphis, this guide covers everything you need. From Tennessee electrical license requirements to exam fees, we provide the essential tools to help you succeed.
The TN LLE exam focuses on projects under $25,000. For larger projects, a full contractor's license is required. Ensure you study the current NEC edition referenced in the candidate bulletin. Practice with the free TN LLE - Tennessee Limited Licensed Electrician practice test on PracticeTestGeeks (7 questions with answer explanations).
Job seekers and professionals preparing for pre-employment screening can practice with our IBEW aptitude test 2026, designed to match the problem-solving, numerical, and verbal reasoning formats used by major employers.
Skilled trades candidates can test their technical knowledge with our journeyman electrician licensing exam 2026, covering NEC code sections, safety calculations, and trade regulations tested in licensing exams.
The TN LLE has 40 questions, takes about 2 hours and costs $53[1] (Tennessee Board for Licensing Contractors, verified Oct 26, 2026).
Numbers in brackets link to the official sources listed under Sources & last verified. Dates that have passed are removed automatically.
| Item | Detail | Source · Verified |
|---|---|---|
| Number of questions | 40 questions, open book[1] | tnboi.provexam.com · Oct 26, 2026 |
| Time limit | 2 hours[1] | tnboi.provexam.com · Oct 26, 2026 |
| Passing score | 73%[1] | tnboi.provexam.com · Oct 26, 2026 |
| Exam fee | $53 per exam[1] | tnboi.provexam.com · Oct 26, 2026 |
| Retake fee | $53 per retake[1] | tnboi.provexam.com · Oct 26, 2026 |
| Retake policy | Unlimited retakes, no waiting period[1] | tnboi.provexam.com · Oct 26, 2026 |
| Validity | 2 years[2] | Tennessee Board for Licensing Contractors · Oct 26, 2026 |
| Delivery | Prov testing centers or Examroom online remote proctoring[1] | tnboi.provexam.com · Oct 26, 2026 |
| Score release | Immediate (email and printed at testing center)[1] | tnboi.provexam.com · Oct 26, 2026 |
Interactive TN LLE - Tennessee Limited Licensed Electrician resources on PracticeTestGeeks, free to start:
According to Tennessee Board for Licensing Contractors, “All examinations are scored against a passing standard of 73%.”[1]
The content areas below are copied from the official TN LLE content outline published by Tennessee Board for Licensing Contractors. The right-hand column shows which of our practice sets covers it.
| Official content area | Practice on this site |
|---|---|
| Conductors and Cables[4] | TN LLE Conductors and Cables Practise matching conductor size and insulation type to the load, the installation conditions, and the circuit protection. |
| General Knowledge and Electrical Installation Requirements[4] | TN LLE TN-LLE General NEC Requirements Get used to the definitions, working clearances, and general installation rules that the other areas build on. |
| Grounding and Bonding[4] | TN LLE Grounding and Bonding Be clear on the difference between grounding and bonding, and on how equipment grounding conductors are sized and connected. |
| Hazardous Locations, Special Occupancies, and Special Equipment[4] | TN LLE Special Occupancies and Equipment Learn how to find the right article for an unusual location or piece of equipment, then read its rules carefully. |
| Lighting, Signs, and General Use Equipment[4] | TN LLE Residential Wiring Practise residential and general-use circuit questions, including receptacles, fixtures, and the equipment that commonly shares those circuits. |
| Low Voltage, Alarms, Signaling Systems, and Communications[4] | TN LLE Electrical Safety Practices Focus on how low-voltage and signaling wiring is kept separate from power wiring, and on the safe work habits that go with it. |
| Overcurrent Protection[4] | TN LLE Overcurrent Protection Practise choosing breaker and fuse ratings for conductors and equipment, and understand why the protective device must suit the wire. |
| Raceways and Boxes[4] | TN LLE Raceways and Boxes Work through raceway fill, box fill, and support questions, and practise finding the right table quickly. |
| Services, Feeders, and Branch Circuits[4] | TN LLE Services, Feeders, Branch Circuits Practise load calculations and sizing steps for services, feeders, and branch circuits, writing out each step as you go. |
Prepare for the TN LLE - Tennessee Limited Licensed Electrician exam with our free practice test modules. Each quiz covers key topics to help you pass on your first try.
These are practice questions written for this site, not questions from the real exam. Each explanation shows why the right answer is right and why the others are wrong.
Question: According to Tennessee licensing requirements, can a Limited Licensed Electrician install a central air conditioning system in a new commercial building?
Answer: C. No, this typically requires a full electrical contractor license
Explanation:
The correct answer is that a Limited Licensed Electrician typically cannot install a central air conditioning system in a new commercial building, because that work generally calls for a full electrical contractor license. The limited license is aimed at residential and small commercial work.
"Yes, without restrictions" is wrong because the license does have limits. "Yes, if the system is under 200 amperes" and "Yes, but only in buildings under 5,000 square feet" are wrong because they invent a tidy threshold that is not how scope is defined. Scope is set by the license class and the type of work, not by one convenient cutoff.
The rule to remember: before taking on a job, check it against the scope of your license class, and when the work is large or commercial, confirm with the Board rather than assuming.
Question: What is the minimum gauge of wire typically used for 20-amp circuits in residential wiring?
Answer: B. 12-gauge
Explanation:
The correct answer is 12-gauge. A 20-amp circuit needs a conductor thick enough to carry that current without overheating, and 12-gauge copper is the size typically used in residential wiring for that rating.
14-gauge and 16-gauge are wrong because they are thinner. A thinner wire has more resistance and heats up sooner, so it would be a fire hazard behind a 20-amp breaker. 10-gauge is thicker than needed for this circuit. It would be safe electrically, but it is not the minimum, and the question asks for the minimum.
The rule to remember: a lower gauge number means a thicker wire, and the wire must be sized to suit the breaker that protects it. Always check the current table for your installation conditions.
Question: What is the correct procedure if an electrical tool or cord is found to be damaged on a job site?
Answer: B. Remove it from service immediately and tag it as defective
Explanation:
The correct answer is to remove the damaged tool or cord from service immediately and tag it as defective. That stops anyone else from picking it up and getting shocked or burned.
Wrapping it with electrical tape is wrong because tape hides damage without restoring the insulation or the strain relief. Using it only for light-duty tasks is wrong because even a light task can expose a worker to live parts or a faulty ground. Reporting it at the end of the work day is wrong because the hazard stays in use for the rest of the shift.
The rule to remember: if equipment is unsafe, take it out of use right away, label it clearly, and report it. Repair or replacement is done by a qualified person afterward, not on the spot.
Start by reading the official exam information on the Prov page so you know the format, the fee, and what you are allowed to bring. Then take a short practice set in each content area to see where you stand. Do not worry about the scores at this stage. Note which areas feel slow or unfamiliar.
Spend most of your time on those weaker areas. For each question you miss, open your code book and find the exact article and table that answers it, then write down where it was. Because the real exam is open book, being able to locate a rule quickly is worth as much as remembering it. Tab your book and practise using the index.
For calculation topics such as load calculations, box fill, and service and feeder sizing, write out every step by hand instead of jumping to the answer. Redo any question you got wrong a few days later without looking at the explanation.
Closer to test day, work through mixed sets under a timer, using the same time limit as the real exam. Keep in mind that our questions are written with AI tools and are not real exam questions, so use them to build habits and find gaps, and rely on your code book for the final answer.
Quick review for the Tennessee Electrical License exam
Our TN LLE study guide breaks down the essential information you need to become a limited licensed electrician. Explore the tabs below for details on format, scoring, and more.
You must answer at least 29 questions correctly to achieve the required 73% passing score.
Since the TN LLE is open book, your ability to quickly find codes in the NEC index is more valuable than memorization. Practice locating TN LLE topics like grounding, ampacity, and box fill.
Expect to spend around $200-$300 total for your exam, license, and basic study materials. This small investment can lead to a career as a Nashville electrician earning over $50k/year.
Get instant access to our complete TN LLE practice test library and start studying today. Don't let the exam stand between you and your license.
Currently, Tennessee does not mandate Continuing Education Units (CEUs) for Limited Licensed Electrician renewals, but always check for the latest board updates.
Try these questions from our free TN LLE - Tennessee Limited Licensed Electrician practice tests. The correct answer and an explanation follow each question.
An electrician is wiring a livestock confinement area in an agricultural building, which is subject to a corrosive atmosphere from animal waste. According to NEC Article 547, which of the following wiring methods is generally permitted?
Answer: A. Type NMC (nonmetallic-sheathed cable).
NEC 547.5 specifies permitted wiring methods for agricultural buildings, especially in areas with dust, moisture, and corrosive atmospheres. Type NMC cable, which has a corrosion-resistant outer jacket, is listed as a suitable method. Standard Type NM-B, EMT, and FMC are generally not suitable for such corrosive environments without additional protection.
An electrician is running a 60-amp branch circuit to supply an appliance. According to NEC Table 250.122, what is the minimum size copper equipment grounding conductor (EGC) required for this circuit?
Answer: C. 10 AWG
NEC Table 250.122, 'Minimum Size Equipment Grounding Conductors for Grounding Raceway and Equipment,' dictates the size of the EGC based on the rating of the overcurrent protective device. For a circuit with a rating of 60 amps, the table requires a minimum of a 10 AWG copper equipment grounding conductor.
A feeder is protected by a 200A circuit breaker. An electrician needs to make a 10-foot feeder tap from this circuit to supply a panelboard. What is the minimum required ampacity of the tap conductors?
Answer: C. 10% of the feeder overcurrent device rating.
According to the 10-foot tap rule in NEC 240.21(B)(1), if the tap conductors leave the enclosure, their ampacity must be at least 10% of the rating of the overcurrent device protecting the feeder. In this case, 10% of 200A is 20A. The tap conductors must also have an ampacity not less than the calculated load and the rating of the device they terminate on.
An electrician is connecting a 10 AWG solid copper conductor to a standard screw terminal on a receptacle. Which of the following installation practices is required by the NEC?
Answer: C. The conductor must be wrapped in a clockwise direction around the screw.
NEC 110.14(A) requires that terminals be used according to the manufacturer's instructions. Standard practice, enforced by inspectors and integral to proper workmanship, dictates that conductors be wrapped clockwise around a screw terminal. This ensures that tightening the screw also tightens the wire loop, creating a secure connection. Wrapping counter-clockwise would cause the loop to open and loosen as the screw is tightened.