Regulatory Codes and Requirements Flashcards
21 cards from real S95 practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 20 Regulatory Codes and Requirements flashcards as text
What is the primary national standard governing fire alarm system installation, inspection, testing, and maintenance?
Answer: NFPA 72
NFPA 72, the National Fire Alarm and Signaling Code, is the primary standard covering all aspects of fire alarm systems.
Under NFPA 72, the term 'Authority Having Jurisdiction' (AHJ) refers to:
Answer: The organization or individual responsible for enforcing requirements
The AHJ is the organization, office, or individual responsible for enforcing code requirements and approving materials and installations.
NFPA 72 Chapter 14 primarily covers which aspect of fire alarm systems?
Answer: Inspection, testing, and maintenance
NFPA 72 Chapter 14 specifically addresses inspection, testing, and maintenance requirements for fire alarm systems.
According to NFPA 72, who is permitted to perform testing and maintenance of a fire alarm system?
Answer: Qualified personnel with fire alarm training and experience
NFPA 72 requires testing and maintenance to be performed by qualified personnel who have relevant training and experience in fire alarm systems.
When a fire alarm system is taken out of service for maintenance, NFPA 72 requires notification to be given to:
Answer: The fire department and building owner or representative
NFPA 72 requires that both the fire department and the building owner or representative be notified when a fire alarm system is out of service.
Under NFPA 72, what documentation must be provided upon completion of every fire alarm system installation?
Answer: As-built drawings and a record of completion
NFPA 72 requires as-built drawings and a record of completion documenting the system's configuration and acceptance test results.
A fire alarm control unit (FACU) is defined in NFPA 72 as the component that:
Answer: Receives initiating device signals and controls notification and auxiliary functions
The FACU receives signals from initiating devices, processes them, and activates notification appliances and any auxiliary control functions.
What type of test is performed on a newly installed fire alarm system before it is placed into service?
Answer: Acceptance test
An acceptance test verifies that a newly installed fire alarm system operates correctly before being placed into service.
During a fire alarm system acceptance test, NFPA 72 requires what percentage of installed devices to be tested?
Answer: 100%
NFPA 72 requires 100% of all fire alarm devices to be tested during an acceptance test — no sampling is permitted.
According to NFPA 72, smoke detector sensitivity must first be tested within how long after initial installation?
Answer: Within 1 year of installation
NFPA 72 requires smoke detector sensitivity to be tested within 1 year after installation, then every alternate year thereafter.
When a manual pull station is tested, the accepted method typically involves:
Answer: Mechanically operating the device using a test key
Manual pull stations are tested by mechanically operating them with a test key or by simulating the mechanical pull action per manufacturer instructions.
NFPA 72 requires fire alarm test result documentation to include which of the following?
Answer: Date, name of tester, devices tested, and test results
Test documentation must include the date, identity of the tester, which devices were tested, and the results for each device tested.
When a fire alarm device fails testing, what is the required sequence of actions?
Answer: Tag the device, take corrective action, and retest to confirm repair
Failed devices must be tagged to identify the defect, corrective action must be taken promptly, and the device must be retested to confirm proper operation.
Central station signal transmission must be tested per NFPA 72 at a minimum frequency of:
Answer: Annually
NFPA 72 requires the transmission of signals to the central station to be tested at a minimum annually to ensure the communication path is functional.
According to NFPA 72, where must fire alarm inspection and testing records be kept?
Answer: On the premises and available to the AHJ upon request
NFPA 72 requires that records of inspections and tests be maintained on the premises and made available to the AHJ upon request.
When a deficiency is identified during a fire alarm inspection, the building owner must:
Answer: Correct the deficiency within the timeframe specified by the AHJ
Deficiencies found during inspection must be corrected within the deadline set by the AHJ, which may be immediate for life-safety-critical items.
A fire alarm system 'impairment' is defined as a condition in which:
Answer: Part or all of the fire protection system is out of service
An impairment occurs whenever any part of the fire protection system is out of service, triggering specific notification and fire watch requirements.
When a central monitoring station places a fire alarm system in 'test mode,' this means:
Answer: Test signals will not be dispatched to emergency responders during testing
Test mode prevents test activations from being dispatched to the fire department, allowing technicians to activate devices without triggering unnecessary emergency responses.
The NFPA 72 'record of completion' must be signed by:
Answer: The contractor or installer responsible for the installation
The record of completion must be signed by the responsible contractor or installer, certifying the work was completed per approved plans and NFPA 72 requirements.
When a notification appliance circuit (NAC) develops an open-circuit fault, the fire alarm control unit will typically:
Answer: Display a trouble condition indicating the circuit fault
An open NAC generates a trouble condition on the FACU, alerting supervisory personnel that the circuit requires maintenance.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- nyc.gov — Fees, renewal, score validity, eligibility, retake policy, score release, test dates, test delivery, exam format, passing score · verified Oct 2026