  1. What is the primary purpose of an RICS Level 3 Building Survey (formerly a Full Structural Survey)?

    Answer: To provide a detailed assessment of the property's condition, identify defects, advise on remediation and cost implications, for older, unusual, or significantly altered properties

    An RICS Level 3 Building Survey is the most comprehensive residential survey product. It provides a thorough inspection and detailed report on construction, condition, and all visible defects. It is particularly appropriate for older, non-standard, or significantly extended properties where hidden defects are more likely.

  2. What does 'dampness' in a building typically refer to, and what are the three main sources?

    Answer: Unwanted moisture in the building fabric — the three main sources are rising damp (groundwater), penetrating damp (rain ingress), and condensation (moisture from internal humid air)

    Dampness is a fundamental building pathology concern. Rising damp occurs when groundwater moves up through masonry by capillary action. Penetrating damp results from rainwater entering through defective roofs, flashings, windows, or walls. Condensation forms when humid interior air meets cold surfaces. Each has different symptoms, causes, and remedies.

  3. What is 'subsidence' and how does it differ from 'settlement' in building surveying?

    Answer: Subsidence is downward movement of the ground beneath a building due to loss of support (e.g., shrinking clay, root damage, mining); settlement is the gradual, expected compression of ground under a new building's load — settlement is normal, subsidence is a defect

    Settlement is the natural, expected compaction of soil beneath foundations as a new building load is applied — it is generally minor and self-limiting. Subsidence is abnormal ground movement causing unintended structural movement, often due to shrinkage of clay soils (particularly in dry summers), tree root desiccation, leaking drains, or historical mining. Surveyors must distinguish between the two as they have very different implications.

  4. What is a 'Schedule of Condition' and when would a commercial building surveyor prepare one?

    Answer: A factual record of a property's condition at a specific date, typically prepared before a lease is granted — used to limit a tenant's dilapidations liability at lease end

    A Schedule of Condition is a photographic and written record of a property's existing condition, agreed between landlord and tenant before lease commencement. Its key purpose is to define the baseline condition, so that at lease end the tenant's dilapidations liability is limited to deterioration beyond that starting point — not to returning the property to better than its original state.

  5. What is a 'Party Wall etc. Act 1996' notice and when must it be served?

    Answer: A formal notice served by a building owner on an adjoining owner before carrying out works affecting a party wall, party structure, or excavation near the neighbour's building — typically 1–2 months before works begin

    The Party Wall etc. Act 1996 requires building owners to serve formal notice on adjoining owners before carrying out certain works: building on or at the boundary line, works to an existing party wall or structure, and excavations within specified distances of a neighbour's foundations. The Act provides a dispute resolution mechanism and is a key area of practice for building surveyors.

  6. What is a 'dilapidations' claim in commercial property and what does a terminal schedule typically contain?

    Answer: A landlord's claim against a tenant at or near lease end for breach of repairing, decorating, and reinstatement obligations — a terminal schedule itemises each breach, the required remedy, and the estimated cost of works

    Dilapidations are breaches of a tenant's lease covenants to repair, decorate, and reinstate the property. At or near lease end, the landlord's surveyor prepares a terminal schedule of dilapidations listing each breach, the remedy required, and the cost. The tenant (or their surveyor) will typically prepare a counter-schedule, and negotiations take place to agree a settlement. The Landlord and Tenant Act 1954 and RICS guidance cap the landlord's damages at the diminution in value of the reversion.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. rics.org — Exam dates, registration, retake fee, fees, eligibility, renewal, retake policy, score validity, test delivery, exam format · verified Oct 2026