Product Management Production Management — Questions and Answers
Question 1: Which production scheduling technique uses a visual board to limit work-in-progress and pull tasks through a workflow?
- Critical Path Method
- Kanban (Correct answer)
- PERT Chart
- Gantt Chart
Correct answer: Kanban
Kanban uses visual boards with WIP limits to pull work through stages, preventing bottlenecks.
Question 2: In production planning, what does 'takt time' represent?
- The time to complete one full production run
- The available production time divided by customer demand rate (Correct answer)
- The time lost to machine downtime
- The lead time from order to delivery
Correct answer: The available production time divided by customer demand rate
Takt time sets the pace of production by dividing available work time by customer demand.
Question 3: A manufacturer discovers a recurring defect late in the assembly line. Which approach best addresses this at the root cause?
- Increase final inspection staff
- Apply the 5 Whys technique (Correct answer)
- Scrap all affected units immediately
- Raise the selling price to cover rework costs
Correct answer: Apply the 5 Whys technique
The 5 Whys iteratively asks why a problem occurred to identify and eliminate the root cause.
Question 4: What is the primary purpose of a Master Production Schedule (MPS)?
- To track employee performance metrics
- To specify what end products will be made and when (Correct answer)
- To calculate raw material costs
- To assign maintenance schedules to equipment
Correct answer: To specify what end products will be made and when
The MPS drives downstream planning by defining the quantity and timing of finished goods production.
Question 5: Which inventory model minimizes total holding and ordering costs by calculating an optimal order quantity?
- ABC Analysis
- Safety Stock Model
- Economic Order Quantity (EOQ) (Correct answer)
- Material Requirements Planning (MRP)
Correct answer: Economic Order Quantity (EOQ)
EOQ finds the order quantity that minimizes the sum of holding costs and ordering costs.
Question 6: A plant's Overall Equipment Effectiveness (OEE) score is 64%. Which three factors combine to produce this metric?
- Cost, Quality, Delivery
- Availability, Performance, Quality (Correct answer)
- Uptime, Speed, Waste
- Throughput, Yield, Efficiency
Correct answer: Availability, Performance, Quality
OEE = Availability × Performance × Quality, measuring how effectively a machine is utilized.
Question 7: Which production layout groups similar machines or processes together regardless of product type?
- Product layout
- Cellular layout
- Fixed-position layout
- Process layout (Correct answer)
Correct answer: Process layout
A process (functional) layout clusters machines by function, allowing flexible routing for varied products.
Question 8: In lean manufacturing, 'muda' refers to:
- A continuous improvement event
- Any activity that consumes resources without adding value (Correct answer)
- A standard work document
- A quality control checkpoint
Correct answer: Any activity that consumes resources without adding value
Muda is the Japanese term for waste — activities that use resources but create no value for the customer.
Question 9: A company uses a pull system where production is triggered only when downstream demand signals it. This is an example of:
- MRP push scheduling
- Just-In-Time (JIT) production (Correct answer)
- Batch-and-queue processing
- Theory of Constraints buffer management
Correct answer: Just-In-Time (JIT) production
JIT production pulls material through the system based on actual demand, reducing inventory and waste.
Question 10: Which quality tool displays the frequency of defect categories in descending order to identify the most significant issues?
- Fishbone diagram
- Control chart
- Pareto chart (Correct answer)
- Scatter diagram
Correct answer: Pareto chart
A Pareto chart ranks defect types by frequency, applying the 80/20 rule to prioritize improvement efforts.
Question 11: Capacity Requirement Planning (CRP) differs from Rough-Cut Capacity Planning (RCCP) because CRP:
- Uses only aggregate demand forecasts
- Analyzes capacity at a high level using key resources only
- Performs detailed analysis of all work centers against the MRP plan (Correct answer)
- Ignores open shop orders
Correct answer: Performs detailed analysis of all work centers against the MRP plan
CRP provides a detailed, work-center-level analysis of capacity needs derived from the full MRP plan.
Question 12: A manufacturer experiences frequent machine breakdowns causing unplanned downtime. Which maintenance strategy would most proactively prevent this?
- Reactive maintenance
- Preventive maintenance (Correct answer)
- Corrective maintenance
- Deferred maintenance
Correct answer: Preventive maintenance
Preventive maintenance schedules regular inspections and servicing to reduce the likelihood of unexpected failures.
Question 13: In production management, a 'bottleneck' is best defined as:
- A resource whose capacity equals or exceeds demand
- Any process step with more than two workers
- The resource that limits total system throughput (Correct answer)
- A step that requires specialized tooling
Correct answer: The resource that limits total system throughput
A bottleneck constrains the entire system's output because its capacity is less than demand placed on it.
Question 14: Which production strategy builds inventory to a forecast before demand arrives, accepting the risk of excess stock?
- Make-to-Order (MTO)
- Assemble-to-Order (ATO)
- Make-to-Stock (MTS) (Correct answer)
- Engineer-to-Order (ETO)
Correct answer: Make-to-Stock (MTS)
Make-to-Stock produces finished goods in advance based on demand forecasts, enabling fast delivery at the cost of inventory risk.
Question 15: A product manager is evaluating whether to add a new production line. The break-even analysis shows fixed costs of $500,000 and a contribution margin of $50 per unit. What is the break-even volume?
- 5,000 units
- 10,000 units (Correct answer)
- 25,000 units
- 50,000 units
Correct answer: 10,000 units
Break-even volume = Fixed Costs ÷ Contribution Margin = $500,000 ÷ $50 = 10,000 units.
Question 16: Which scheduling approach schedules jobs by starting from the due date and working backward to determine the latest possible start date?
- Forward scheduling
- Backward scheduling (Correct answer)
- Infinite capacity scheduling
- First-Come-First-Served scheduling
Correct answer: Backward scheduling
Backward scheduling calculates start dates by working back from the due date, minimizing work-in-process time.
Question 17: Statistical Process Control (SPC) uses control charts primarily to:
- Set production quotas for workers
- Distinguish between common cause and special cause variation (Correct answer)
- Calculate the optimal batch size
- Determine supplier lead times
Correct answer: Distinguish between common cause and special cause variation
SPC control charts signal when process variation is due to an assignable (special) cause requiring investigation, vs. normal random variation.
Question 18: A company applies ABC inventory classification. 'A' items should be managed with:
- Minimal oversight and periodic counts
- Loose reorder policies and large safety stock
- Tight controls, frequent reviews, and accurate records (Correct answer)
- Automated reorder triggers only
Correct answer: Tight controls, frequent reviews, and accurate records
A items represent high-value, high-priority inventory requiring strict controls and frequent cycle counts.
Question 19: The Theory of Constraints (TOC) 'Five Focusing Steps' begin with which action?
- Subordinate everything to the constraint
- Elevate the constraint
- Identify the system's constraint (Correct answer)
- Exploit the constraint
Correct answer: Identify the system's constraint
TOC's first step is to identify the single constraint that limits the system's throughput before taking any action.
Question 20: Single Minute Exchange of Die (SMED) is a lean technique designed to:
- Reduce the number of product variants in production
- Eliminate all setup activities permanently
- Reduce machine changeover time to under ten minutes (Correct answer)
- Standardize die specifications across suppliers
Correct answer: Reduce machine changeover time to under ten minutes
SMED aims to shorten equipment changeover time to single-digit minutes, increasing flexibility and reducing batch sizes.
Question 21: Which term describes the total time from when a customer places an order to when they receive the finished product?
- Cycle time
- Takt time
- Lead time (Correct answer)
- Throughput time
Correct answer: Lead time
Lead time is the elapsed time from order placement to customer delivery, encompassing all production and logistics steps.
Which production scheduling technique uses a visual board to limit work-in-progress and pull tasks through a workflow?
What Practice Test Geeks adds beyond an AI chat for Product Management
An AI chatbot can quiz you, but it can't reproduce the exam conditions or keep your record. Here you get:
- A timed, full-length Product Management mock exam — 120 questions in 120 minutes with a 74% pass mark, modeled on the official exam's question count and time limit, followed by a score report broken down by exam domain.
- A fixed Product Management question bank: the same test every attempt, so your score is comparable from one try to the next instead of changing with every regenerated quiz.
- Progress saved on your device: completed tests, scores and missed questions stay in My Progress, so you can retake only what you got wrong.
- A printable Product Management cheat sheet you can print or save as a PDF.
- Product Management flashcards built from the same question bank.
Practice questions written with AI assistance and published by Nathan Beja, founder of Practice Test Geeks. They are not real exam questions. We have not yet matched this exam's facts to an official source, so confirm fees, dates and rules with the exam body. Editorial policy