Which production scheduling technique uses a visual board to limit work-in-progress and pull tasks through a workflow?
Answer: Kanban
Kanban uses visual boards with WIP limits to pull work through stages, preventing bottlenecks.
In production planning, what does 'takt time' represent?
Answer: The available production time divided by customer demand rate
Takt time sets the pace of production by dividing available work time by customer demand.
A manufacturer discovers a recurring defect late in the assembly line. Which approach best addresses this at the root cause?
Answer: Apply the 5 Whys technique
The 5 Whys iteratively asks why a problem occurred to identify and eliminate the root cause.
What is the primary purpose of a Master Production Schedule (MPS)?
Answer: To specify what end products will be made and when
The MPS drives downstream planning by defining the quantity and timing of finished goods production.
Which inventory model minimizes total holding and ordering costs by calculating an optimal order quantity?
Answer: Economic Order Quantity (EOQ)
EOQ finds the order quantity that minimizes the sum of holding costs and ordering costs.
A plant's Overall Equipment Effectiveness (OEE) score is 64%. Which three factors combine to produce this metric?
Answer: Availability, Performance, Quality
OEE = Availability × Performance × Quality, measuring how effectively a machine is utilized.
Which production layout groups similar machines or processes together regardless of product type?
Answer: Process layout
A process (functional) layout clusters machines by function, allowing flexible routing for varied products.
In lean manufacturing, 'muda' refers to:
Answer: Any activity that consumes resources without adding value
Muda is the Japanese term for waste — activities that use resources but create no value for the customer.
A company uses a pull system where production is triggered only when downstream demand signals it. This is an example of:
Answer: Just-In-Time (JIT) production
JIT production pulls material through the system based on actual demand, reducing inventory and waste.
Which quality tool displays the frequency of defect categories in descending order to identify the most significant issues?
Answer: Pareto chart
A Pareto chart ranks defect types by frequency, applying the 80/20 rule to prioritize improvement efforts.
Capacity Requirement Planning (CRP) differs from Rough-Cut Capacity Planning (RCCP) because CRP:
Answer: Performs detailed analysis of all work centers against the MRP plan
CRP provides a detailed, work-center-level analysis of capacity needs derived from the full MRP plan.
A manufacturer experiences frequent machine breakdowns causing unplanned downtime. Which maintenance strategy would most proactively prevent this?
Answer: Preventive maintenance
Preventive maintenance schedules regular inspections and servicing to reduce the likelihood of unexpected failures.
In production management, a 'bottleneck' is best defined as:
Answer: The resource that limits total system throughput
A bottleneck constrains the entire system's output because its capacity is less than demand placed on it.
Which production strategy builds inventory to a forecast before demand arrives, accepting the risk of excess stock?
Answer: Make-to-Stock (MTS)
Make-to-Stock produces finished goods in advance based on demand forecasts, enabling fast delivery at the cost of inventory risk.
A product manager is evaluating whether to add a new production line. The break-even analysis shows fixed costs of $500,000 and a contribution margin of $50 per unit. What is the break-even volume?
Answer: 10,000 units
Break-even volume = Fixed Costs ÷ Contribution Margin = $500,000 ÷ $50 = 10,000 units.
Which scheduling approach schedules jobs by starting from the due date and working backward to determine the latest possible start date?
Answer: Backward scheduling
Backward scheduling calculates start dates by working back from the due date, minimizing work-in-process time.
Statistical Process Control (SPC) uses control charts primarily to:
Answer: Distinguish between common cause and special cause variation
SPC control charts signal when process variation is due to an assignable (special) cause requiring investigation, vs. normal random variation.
A company applies ABC inventory classification. 'A' items should be managed with:
Answer: Tight controls, frequent reviews, and accurate records
A items represent high-value, high-priority inventory requiring strict controls and frequent cycle counts.
The Theory of Constraints (TOC) 'Five Focusing Steps' begin with which action?
Answer: Identify the system's constraint
TOC's first step is to identify the single constraint that limits the system's throughput before taking any action.
Single Minute Exchange of Die (SMED) is a lean technique designed to:
Answer: Reduce machine changeover time to under ten minutes
SMED aims to shorten equipment changeover time to single-digit minutes, increasing flexibility and reducing batch sizes.