A test engineer reports that test probe access is blocked by a component added late in layout. How could this have been prevented?
-
A
By increasing board size automatically
-
B
By involving test engineering in early design reviews and sharing testability requirements upfront
-
C
By removing all through-hole components
-
D
By outsourcing the test design to the EMS provider