PCB Cheat Sheet 2026

The 30 highest-yield PCB facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

100 questions
120 min time limit
73.00% to pass
  1. A PCB professional's duty to report suspected child abuse is: Mandatory in all U.S. states regardless of professional opinion
  2. When scaling a pilot PCB program to a larger population, the most critical consideration is: Maintaining core program components while adapting for new contexts
  3. In PCB data privacy, de-identified data means that: All direct and indirect identifiers have been removed so individuals cannot be identified
  4. What role does peer review play in Design practice? It provides quality assurance and professional development through collegial evaluation
  5. What is a risk mitigation strategy in Design practice? Implementing controls that reduce the likelihood or impact of identified risks
  6. What is the purpose of regular risk reviews in Design practice? To identify new risks, evaluate control effectiveness, and update mitigation strategies
  7. A PCB practitioner is offered a gift by a client's family member in gratitude for services. What should the practitioner do? Decline politely and explain professional boundary policies
  8. What happens to the impedance of a real bypass capacitor at frequencies above its self-resonant frequency (SRF)? It increases as the component behaves inductively due to ESL
  9. What is the primary value of case study analysis in Design training? Developing critical thinking by applying theory to realistic professional scenarios
  10. Which approach best ensures that a PCB program is culturally responsive? Co-designing the program with members of the target community from the outset
  11. What is/are the need(s) for precision differential amplifiers to be guarded? A & B
  12. What is the word that is being used to describe this? "the number of times the waveform repeats itself in one second" Frequency
  13. A pre-test/post-test design in PCB evaluation is primarily used to: Measure change in participants between the start and end of an intervention
  14. Which of the following will happen if one of the ornament bulbs in a string of bulbs is shorted out? The current in the string will go up
  15. What is Near-End Crosstalk (NEXT) and where does it appear on the victim trace? Crosstalk appearing at the near (source) end of the victim trace, traveling backward
  16. How should PCB professionals prioritize identified risks? Based on likelihood of occurrence combined with severity of potential impact
  17. A PCB professional who practices beyond their area of training and competence is violating the ethical principle of: Competence
  18. Which of the following devices/equipments should be used to eliminate ground and supply line noise when constructing TTL/CMOS / ECL PCBs? Decoupling capacitor
  19. Consider three parallel resistors with values of 22 Ω, 27 Ω, and 33 Ω. What is the current drawn from a 12-volt battery when linked across this combination? 1.4 A
  20. Which phenomenon is not mitigated by low-impedance circuit lines, such as those provided by power and return planes for shielding purposes? Convection
  21. Why is documentation important in PCB risk management? It creates an audit trail, supports decision-making, and demonstrates due diligence
  22. What is the primary competency framework for Design professionals? Structured competency standards defined by the certifying body
  23. In PCB practice, a continuous quality improvement (CQI) cycle involves: Ongoing cycles of planning, implementing, measuring, and improving program activities
  24. A series-parallel resistive network is frequently required by good engineering practice. from resistors that are all identical
  25. SMART goals in PCB program design are best described as: Specific, Measurable, Achievable, Relevant, and Time-bound objectives
  26. A PCB professional reviewing program data notices a statistically significant improvement in outcomes but a very small effect size. This means: The change was real but may be too small to be practically meaningful
  27. What is the '3W rule' in high-speed PCB trace routing? Center-to-center trace spacing must be at least 3 times the trace width
  28. How many times should a weapon be subjected to quick action? 1
  29. What are the sight picture's two essential elements? sight alignment, placing of the aiming point
  30. When terminating services with a client, a PCB professional should: Provide adequate notice, a summary of progress, and referrals as needed
Turn these facts into recall: