A TQL-managed shipment arrives at the receiver's dock with visible damage to several pallets. What is the most critical first action the TQL representative must advise the receiver to take to preserve the right to file a claim?
-
A
Immediately reject the entire shipment and send it back with the driver.
-
B
Accept the shipment but make a detailed notation of the specific damage on the Proof of Delivery (POD) before signing.
-
C
Unload the entire shipment and segregate the damaged goods for a later inspection.
-
D
Call the TQL claims department and wait for their instructions before unloading the freight.