A supervisor is preparing for an annual evacuation drill. To ensure the drill effectively evaluates the Emergency Action Plan (EAP), which of the following is the MOST critical element to include?
-
A
Scheduling the drill during a time of maximum occupancy to test the system under stress.
-
B
A post-drill debriefing with employees to identify weaknesses and areas for improvement in the plan.
-
C
Ensuring all fire extinguishers are fully charged and inspected prior to the drill.
-
D
Notifying the local fire department of the exact time and date of the planned drill.