A maintenance technician is about to perform work on a large industrial pump. What is the first and most critical step the technician must take according to standard Lockout/Tagout (LOTO) procedures before beginning any work?
-
A
Notify the shift supervisor that the work is beginning.
-
B
Gather all necessary tools and replacement parts at the worksite.
-
C
Place a 'Do Not Operate' sign on the local pump controls.
-
D
De-energize, isolate the energy source, and apply a personal lock and tag.