An electrician is preparing to perform maintenance on a permanently installed industrial machine. After shutting down the equipment using the normal stopping procedure, what is the next critical step required by the OSHA Lockout/Tagout standard (29 CFR 1910.147) before applying a lock?
-
A
Verbally inform all coworkers in the immediate area.
-
B
Locate and operate the energy isolating device(s) to isolate the machine from its energy source.
-
C
Test the machine's start button to ensure it doesn't operate.
-
D
Immediately attach a personal lock to the main control panel.