A manufacturing facility generates 1,200 kg of hazardous waste in a calendar month. The waste is stored on-site before being shipped to a treatment facility. According to RCRA regulations, what is the maximum number of days this facility can accumulate this waste on-site without a storage permit?
-
A
180 days
-
B
270 days
-
C
Unlimited, as long as the quantity does not exceed 6,000 kg
-
D
90 days