During a confined space rescue on a construction site, what type of retrieval system should be readily available before entry begins?
-
A
A crane with a personnel basket
-
B
A mechanical retrieval device such as a tripod and winch
-
C
A rope ladder placed inside the space
-
D
A backup team of at least five rescuers