NEBOSH CC Cheat Sheet 2026

The 30 highest-yield NEBOSH CC facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

50 questions
60 min time limit
45.00% to pass
  1. What is the most common type of occupational ill health in the UK construction industry? Musculoskeletal disorders
  2. Under LOLER 1998, how frequently must lifting equipment used for lifting persons be thoroughly examined? Every 6 months
  3. What is the role of a CDM Coordinator on a domestic project under CDM 2015? There is no CDM Coordinator role under CDM 2015
  4. Which regulations specifically require employers to avoid hazardous manual handling operations where reasonably practicable? Manual Handling Operations Regulations 1992
  5. What is the safe distance that should be maintained from overhead power lines when using plant such as cranes or excavators? At least 3 metres from uninsulated overhead lines under 33kV
  6. What is the first step in the hierarchy for managing manual handling risks? Avoid the hazardous manual handling operation entirely
  7. What is the Exposure Limit Value (ELV) for whole body vibration under the Control of Vibration at Work Regulations 2005? 1.15 m/s² A(8)
  8. What does 'SWL' mean in the context of working at height equipment? Safe Working Load
  9. What is the purpose of a 'walkway' or bridge over an excavation? To allow safe pedestrian crossing without the risk of falling in
  10. Under CDM 2015, who is responsible for managing the health and safety of workers on a construction site day-to-day? Principal Contractor
  11. What is the risk of using a damaged extension lead on a construction site? Electrocution, electric shock or fire due to exposed conductors or poor connections
  12. What is the recommended first action when an uncharted underground service is discovered during excavation? Stop work, secure the area, and contact the relevant utility company
  13. At what angle should a leaning ladder be positioned? 75 degrees (1 out for every 4 up)
  14. Under CDM 2015, what document must be prepared by the principal designer and handed to the client at the end of the project? The health and safety file
  15. Which regulation requires duty holders to carry out a fire risk assessment for workplaces including construction sites? Regulatory Reform (Fire Safety) Order 2005
  16. What does 'dead working' mean in the context of electrical safety? Working on electrical equipment that has been isolated and proved dead before work begins
  17. What is the correct action if a portable power tool develops a fault mid-use? Stop using it immediately, disconnect from the supply and label it as faulty for repair
  18. What is the role of a scaffold tag system on a construction site? To communicate the inspection status of a scaffold to all workers
  19. What is the Workplace Exposure Limit (WEL) for respirable crystalline silica dust under EH40? 0.1 mg/m³ (8-hour TWA)
  20. What is the purpose of a trench box (also called a drag box) in excavation work? To provide a pre-made support system that can be dragged along as the trench progresses
  21. Which type of lung disease is associated with prolonged exposure to coal or general inert dusts? Pneumoconiosis
  22. Which class of fire involves cooking oils and fats? Class F
  23. What is the Exposure Action Value (EAV) for hand-arm vibration under the Control of Vibration at Work Regulations 2005? 2.5 m/s² A(8)
  24. Which of the following items is classified as a lifting accessory under LOLER 1998? A wire rope sling
  25. What does an MCB (Miniature Circuit Breaker) protect against? Overload and short circuit current in a circuit
  26. A worker needs to use a ladder to access a scaffold platform 5 metres above ground. What angle should the ladder be set at? 75 degrees (1 out for every 4 up)
  27. Which type of cable is suitable for use outdoors on a construction site? Heavy-duty rubber or armoured cable rated for outdoor use
  28. What is the primary purpose of a fire door on a construction site or building? To resist the passage of fire and smoke between compartments, maintaining means of escape
  29. Before any excavation work begins on a construction site, what is the essential first step to identify underground hazards? Obtain service plans from utility providers and carry out a CAT and Genny scan of the area
  30. What is a 'confined space' entry risk that may be encountered in a deep excavation? Oxygen depletion or build-up of toxic gases