The NEBOSH Health and Safety Management for Construction is a professional certification assessment in United Kingdom. Thorough preparation is essential to demonstrate your knowledge and competency in this field.
Our comprehensive collection of free NEBOSH CC practice questions covers all exam domains and topics. Use these detailed study materials to build confidence and improve your test performance.
Facts verified Oct 21, 2026 against NEBOSH. Dates that have passed are removed automatically.
| Item | Detail | Official source |
|---|---|---|
| Time limit | 48-hour open-book exam | NEBOSH |
| Exam fee | ยฃ189 NEBOSH registration fee per assignment (course fees extra) | NEBOSH |
| Retake policy | Unlimited re-sits if referred; best mark kept | NEBOSH |
| Delivery | Online, open-book, taken at home or another suitable place | NEBOSH |
| Eligibility | No entry requirements; must study with an accredited Learning Partner; IELTS 6.0+ recommended | NEBOSH |
| Next exam date | Next CN1 exam: Tue 5 Jan 2027 (then 6 Apr, 6 Jul, 5 Oct 2027) | NEBOSH |
| Registration deadline | Register through your NEBOSH Learning Partner | NEBOSH |
Facts verified Oct 21, 2026 against NEBOSH. Dates that have passed are removed automatically.
Important: The NEBOSH CC examination requires thorough understanding of all core subject areas. Review the official UK exam guidelines and ensure you meet all eligibility requirements before scheduling your test date.
Prepare for the NEBOSH - Construction Certificate exam with our free practice test modules. Each quiz covers key topics to help you pass on your first try.
Join thousands of candidates who have used our free practice tests to prepare for the NEBOSH Health and Safety Management for Construction. Start practising today and build the confidence you need to succeed.
If you are preparing for a career in construction & safety, you may also find these related practice tests helpful:
Prepare for the NEBOSH - National Examination Board in Occupational Safety and Health IGC โ the NEBOSH International General Certificate in occupational health and safety management.
Prepare for the IOSH - Institution of Occupational Safety and Health Managing Safely โ the IOSH Managing Safely certification for managers and supervisors responsible for workplace safety.
Prepare for the CITB - Construction Industry Training Board โ the UK Construction Industry Training Board health and safety test required for CSCS cards.
Prepare for the CSCS - Construction Skills Certification Scheme โ the Construction Skills Certification Scheme card test verifying health and safety knowledge on UK sites.
Prepare for the CHST - Construction Health and Safety Technician โ the Construction Health and Safety Technician certification for safety professionals on construction sites.
Try these questions from our free NEBOSH Construction Certificate practice tests. The correct answer and an explanation follow each question.
What personal fall protection system uses a short lanyard with an energy absorber to limit free fall distance?
Answer: A. Fall arrest system
A fall arrest system uses a lanyard with an energy absorber connected to a full-body harness and an anchor point. It limits the distance fallen and absorbs energy to reduce the forces on the body during an arrested fall.
What is the maximum recommended height for a free-standing mobile tower scaffold used outdoors?
Answer: A. The height should not exceed a base-to-height ratio of 1:3 outdoors (or 1:3.5 indoors)
For stability, mobile tower scaffolds should not exceed a base-to-height ratio of 1:3 outdoors and 1:3.5 indoors. PASMA guidance provides specific recommendations. Outriggers and stabilisers can increase the effective base dimension. The scaffold must never be moved with persons or loose materials on the platform.
What is the correct fit test for a tight-fitting respirator (FFP mask) called?
Answer: A. Fit testing
Fit testing is the formal procedure to verify that a tight-fitting respirator provides an adequate seal to the wearer's face. There are two types: qualitative (using a substance the wearer can smell or taste if it leaks) and quantitative (using instruments to measure leakage).
LPG (liquefied petroleum gas) cylinders are commonly used on construction sites for heating and cutting. What is the correct storage practice?
Answer: A. Stored upright, in a well-ventilated area, away from ignition sources, drains, and below ground level, with full and empty cylinders separated
LPG cylinders must be stored upright (to keep the relief valve in contact with vapour, not liquid), in a well-ventilated area, at least 3 metres from ignition sources, away from drains (LPG is heavier than air and can accumulate in low points). Full and empty cylinders should be separated and the store should be signed and secured.