What is the function of a shop drawing in the construction administration phase?
-
A
It replaces the designer's construction documents for permitting
-
B
It shows the contractor's or fabricator's interpretation of design intent for review
-
C
It is the designer's final set of as-built drawings
-
D
It documents field changes made without designer approval