  1. Which project delivery method requires the designer to complete full construction documents before a contractor is selected through competitive bidding? Design-bid-build (DBB)
  2. Which section of the NCIDQ exam tests a candidate's ability to apply building codes and life safety requirements in a design scenario? PRAC
  3. Which net-to-gross ratio is most commonly used for estimating total building area from programmed net square footage in office projects? 1.25–1.35
  4. What is the minimum required headroom clearance in a means of egress under IBC? 7 feet 6 inches
  5. A designer specifies carpet with a static electricity rating of 3.5 kV. Which environment is this specification most critical for? Healthcare operating room or data center
  6. In interior design practice, 'value engineering' typically involves: Substituting materials or methods to reduce cost while maintaining performance
  7. Which type of window treatment provides the most effective control of both glare and privacy without blocking daylight entirely? Solar/screen shade
  8. The contractors and the? usually attend bid openings. Owner and interior designer
  9. What flooring test gives the most accurate indication of slip resistance? ASTM D2047
  10. Which resilient flooring type consists of a photographic layer protected by a clear urethane wear layer? Luxury Vinyl Tile/Plank (LVT/LVP)
  11. Which standard provides the detailed accessibility specifications that are referenced by both ADA and most state building codes? ICC A117.1 Accessible and Usable Buildings and Facilities
  12. Which phase of FF&E procurement involves issuing competitive bids to vendors for specified furniture items? Request for Quotation (RFQ)
  13. Which document formally summarizes the client's spatial needs, including room counts, areas, and adjacency requirements? Program document
  14. What egress requirement determines the minimum number of exits required from a space in most US building codes? Occupant load
  15. Which kind of carrier offers the general public a service for moving furniture? common carrier
  16. According to IES recommendations, what is the typical illuminance range for general office tasks such as reading and computer work? 30–50 footcandles
  17. Which federal law is the primary accessibility standard for commercial facilities in the United States? Americans with Disabilities Act (ADA)
  18. What is the main function of a program document in the pre-design phase? To define the client's spatial needs, goals, and priorities
  19. Which professional organization accredits interior design education programs in North America? CIDA (Council for Interior Design Accreditation)
  20. Who could make a quick sketch perspective drawing the easiest? Using a perspective grid
  21. A designer specifies a material with a flame spread index of 150. Which ASTM standard classification does this fall under? Class C
  22. What is the primary difference between porcelain and ceramic tile from a specification standpoint? Porcelain has lower water absorption (≤0.5%) and greater density
  23. When specifying paint for a high-traffic corridor, which finish is most appropriate for durability and cleanability? Semi-gloss
  24. What is the required minimum clear floor space at a side-approach accessible lavatory per ADA standards? 30 inches × 48 inches
  25. What is the primary purpose of a 'door schedule' in construction documents? Tabulating each door's size, type, material, hardware set, and fire rating in one document
  26. In ergonomics, the standard seated desk height for most adults in the US is approximately: 28 to 30 inches
  27. The term 'fenestration' in building design refers to: The system of windows, doors, and other openings in a building envelope
  28. Under ADA standards, what is the maximum allowable knee clearance depth required under an accessible work surface? 19 inches
  29. What is the primary purpose of a 'reflected ceiling plan' in construction documents? To document lighting, ceiling materials, and overhead mechanical elements as if looking up
  30. Which phase of interior design services produces the documents used for contractor bidding? Construction documents (CD) phase