Construction Documents and Details Flashcards

6 cards from real NCIDQ practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Construction Documents and Details flashcards as text
  1. Which phase of interior design services produces the documents used for contractor bidding?

    Answer: Construction documents (CD) phase

    The construction documents phase produces fully coordinated drawings and specifications with sufficient detail for contractors to bid and build the project.

  2. What does 'submittals' refer to during the construction administration phase?

    Answer: Documents and samples (shop drawings, product data, samples) sent by the contractor for designer review

    Submittals are contractor-prepared or collected documents — including shop drawings, product data sheets, and physical material samples — sent to the designer for review and approval before work proceeds.

  3. In construction documents, what does a 'partition type' legend typically convey?

    Answer: Wall assembly composition (stud size, layers of GWB, insulation, fire rating) keyed to symbols on the plan

    Partition type legends identify each wall assembly by a code (e.g., P-1, P-2) and describe its stud gauge, height, GWB layers, insulation, and fire/acoustic rating.

  4. What is the purpose of 'record drawings' (as-builts) at the end of a construction project?

    Answer: To document actual conditions as built, reflecting all field changes from the original construction documents

    Record drawings capture all field changes, substitutions, and as-installed conditions, providing the owner with an accurate document of what was actually constructed.

  5. What is an 'addendum' in the context of a bidding set of construction documents?

    Answer: A written modification to the bid documents issued during the bidding period before bids are submitted

    An addendum is a formal written modification or clarification to the bidding documents issued to all bidders before bid submission, ensuring all parties bid on the same information.

  6. Which project delivery method requires the designer to complete full construction documents before a contractor is selected through competitive bidding?

    Answer: Design-bid-build (DBB)

    In the traditional design-bid-build delivery, the designer completes 100% construction documents, which are then issued for competitive bidding to select a general contractor.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. cidq.org — Eligibility, test delivery, registration, retake policy, renewal, time limit, score validity, passing score, score release · verified Oct 2026