  1. What does 'AFF' mean as used in construction document dimensions?

    Answer: Above Finish Floor

    AFF (Above Finish Floor) is used to denote the height of elements such as outlets, switches, grab bars, and shelving measured from the finished floor surface.

  2. In the CSI 3-Part Specification format, what is covered in Part 2 – Products?

    Answer: Materials, fabrication standards, acceptable manufacturers, and product properties

    Part 2 of a CSI spec section describes the products themselves: acceptable manufacturers, material properties, dimensional tolerances, fabrication standards, and finishes.

  3. What is a 'shop drawing' and who typically prepares it?

    Answer: A detailed fabrication drawing prepared by a contractor or fabricator showing how they will build a component

    Shop drawings are detailed fabrication documents prepared by contractors, subcontractors, or fabricators showing dimensions, materials, connections, and installation details for specific components.

  4. What is the difference between 'NIC' and 'NTS' as used on construction drawings?

    Answer: NIC = Not In Contract (scope exclusion); NTS = Not To Scale (drawing notation)

    NIC indicates that an item shown is outside the contract scope and not the contractor's responsibility; NTS notes that a drawing or detail is not drawn to an exact scale.

  5. Which detail type is most critical in specifying the transition between two different flooring materials?

    Answer: Transition strip or threshold detail

    Transition strip details specify the edge treatment, height change accommodation, and installation method at the junction between two flooring materials of different types or thicknesses.

  6. What is a 'punch list' in the context of construction administration?

    Answer: A list of deficiencies and incomplete items prepared at substantial completion requiring correction before final payment

    A punch list documents items that are incomplete, damaged, or not in conformance with the contract documents, compiled during the substantial completion walk-through.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. cidq.org — Eligibility, test delivery, registration, retake policy, renewal, time limit, score validity, passing score, score release · verified Oct 2026