← All Licensed Electrical Contractor Flashcard Decks

Safety and OSHA Regulations Flashcards

7 cards from real Licensed Electrical Contractor practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Safety and OSHA Regulations flashcards as text
  1. Under NFPA 70E, what is the 'restricted approach boundary' for shock protection?

    Answer: The distance within which a shock hazard exists requiring special precautions

    The restricted approach boundary is the distance from an exposed energized conductor within which a shock hazard exists, requiring insulating PPE and other precautions.

  2. Which of the following conditions would require an Occupational Safety and Health Administration (OSHA) Form 300 Log entry for an electrical incident?

    Answer: A worker misses one day of work after being shocked

    OSHA 300 Log recording is required when an injury results in days away from work, restricted work, job transfer, medical treatment beyond first aid, or loss of consciousness.

  3. An electrical contractor is working in a permit-required confined space that contains atmospheric hazards. Which OSHA standard applies?

    Answer: 29 CFR 1910.146

    29 CFR 1910.146 covers permit-required confined spaces in general industry, establishing entry procedures, atmospheric testing, and attendant requirements.

  4. What minimum AFCI protection does the 2023 NEC require for branch circuits supplying all 15A and 20A, 120V outlets in a bedroom?

    Answer: Arc-fault circuit interrupter (AFCI) protection

    The NEC requires AFCI protection for all 15A and 20A, 120V branch circuits supplying outlets in bedrooms to protect against arc-fault ignition of fires.

  5. Under OSHA 29 CFR 1926.405(j), extension cords used on construction sites must be which type?

    Answer: Type S, SO, ST, STO, SJ, SJO, SJT, or SJTO listed for hard or extra-hard usage

    OSHA requires construction extension cords to be of the hard or extra-hard usage types (S, SO, ST, STO, SJ, SJO, SJT, SJTO) to withstand job-site abuse.

  6. What is the purpose of a 'job hazard analysis' (JHA) before starting electrical work?

    Answer: To systematically identify hazards and controls before work begins

    A JHA (also called job safety analysis) proactively identifies hazards associated with each task step and establishes controls before work begins, reducing injury risk.

  7. When using a voltage detector (tick tracer) to verify a circuit is de-energized, what additional verification step is required by NFPA 70E?

    Answer: Test the detector on a known energized source before and after testing the circuit

    NFPA 70E requires voltage-detecting equipment to be tested on a known energized source immediately before and after testing the circuit to verify the detector is functioning properly.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. cslb.ca.gov — Eligibility, fees, renewal · verified Nov 2026
  2. www2.myfloridalicense.com — Exam format, passing score, retake policy, score release, time limit, test delivery, test dates · verified Nov 2026
  3. ncbeec.org — Test delivery, fees, exam format, passing score, retake policy, score release, test dates, time limit · verified Nov 2026