← All Licensed Electrical Contractor Flashcard Decks

FREE Licensed Electrical Contractor Code, Theory, and Calculations Questions and Answers Flashcards

6 cards from real Licensed Electrical Contractor practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 FREE Licensed Electrical Contractor Code, Theory, and Calculations Questions and Answers flashcards as text
  1. According to the NEC, what is the maximum allowable voltage drop recommended for branch circuits?

    Answer: 3%

    The NEC recommends a maximum voltage drop of 3% for branch circuits and 5% total for feeder and branch circuits combined.

  2. What is the ampacity of a 3/0 AWG copper conductor with THWN insulation at 75°C?

    Answer: 200 amps

    Per NEC Table 310.16, a 3/0 AWG copper conductor with 75°C insulation has an ampacity of 200 amps.

  3. When calculating commercial kitchen load, what demand factor does the NEC allow for six or more pieces of kitchen equipment?

    Answer: 65%

    NEC Table 220.56 permits a 65% demand factor when there are six or more pieces of commercial kitchen equipment.

  4. What is the minimum burial depth for rigid metal conduit (RMC) under a one-family dwelling driveway?

    Answer: 18 inches

    Per NEC Table 300.5, RMC requires a minimum burial depth of 18 inches under a one-family dwelling driveway.

  5. In a three-phase delta-connected system, what is the voltage between the high leg and the neutral?

    Answer: 208 volts

    The high leg in a three-phase four-wire delta system produces approximately 208 volts to neutral, calculated as 240 × 1.732 / 2.

  6. What size equipment grounding conductor is required for a circuit protected by a 200-amp overcurrent device?

    Answer: 6 AWG copper

    Per NEC Table 250.122, a 6 AWG copper conductor is the minimum equipment grounding conductor for a 200-amp overcurrent device.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. cslb.ca.gov — Eligibility, fees, renewal · verified Nov 2026
  2. www2.myfloridalicense.com — Exam format, passing score, retake policy, score release, time limit, test delivery, test dates · verified Nov 2026
  3. ncbeec.org — Test delivery, fees, exam format, passing score, retake policy, score release, test dates, time limit · verified Nov 2026