In FMEA (Failure Mode and Effects Analysis), what does the Risk Priority Number (RPN) represent?
-
A
The total cost of all failures in a year
-
B
The product of Severity, Occurrence, and Detection ratings
-
C
The number of defects per million opportunities
-
D
The percentage of time the process fails