A Green Belt plots an X-bar chart and notices that all sample means fall within the control limits but 90% cluster tightly near the centerline. What is the most likely cause?
-
A
The process is highly capable
-
B
The subgroup sample size is too small
-
C
The control limits are too wide relative to the actual process variation
-
D
Common cause variation has been eliminated