What does 'takt time' represent in Lean methodology?
-
A
The time required to complete one full DMAIC cycle
-
B
The rate at which a product must be completed to meet customer demand
-
C
The average time a worker spends on non-value-added activities
-
D
The maximum allowable defect rate in a production run