In the Control phase, what is the primary function of a control chart's Upper Control Limit (UCL)?
-
A
To define the customer's maximum acceptable specification
-
B
To signal when a process has shifted beyond natural variation
-
C
To set the target mean for the process
-
D
To replace the need for a reaction plan