A Black Belt observes that the R-chart shows statistical control, but the X-bar chart shows several out-of-control points. What is the correct interpretation?
-
A
The process variability has increased
-
B
The process mean has shifted while variability remains stable
-
C
The control limits are incorrectly calculated
-
D
Both charts must be in control before analysis is valid