What is the purpose of a BAS 'global controller' or 'central plant optimizer'?
-
A
Store all controller programs as a backup
-
B
Coordinate chiller, boiler, and cooling tower sequencing to minimize total plant energy
-
C
Provide a graphical interface for the building operator
-
D
Manage fire alarm integration with HVAC