What is 'optimal start' in a BAS control strategy?
-
A
Starting all equipment simultaneously at a fixed time each morning
-
B
Calculating the latest possible start time to reach setpoint by occupancy time based on conditions
-
C
Starting the chiller plant before the AHUs each morning
-
D
A manual override feature activated by the building operator