A Roadway Worker in Charge (RWIC) is establishing 'Foul Time' on a controlled track. Before the foul time becomes effective, what communication must occur between the RWIC and the train dispatcher?
-
A
The RWIC must state their name, location, and the number of workers in their group.
-
B
The train dispatcher must provide a unique authorization number to the RWIC.
-
C
The RWIC must repeat the track identifier, limits, and time of the foul time back to the dispatcher for verification.
-
D
The RWIC must confirm that all workers are wearing high-visibility personal protective equipment.